Consolidated Statement on various Environmental Aspects for Construction Project

Important Note before filling the form: 1. Fill the form in the same format (i.e. Font: Times New Roman and font size: 12) 2. Do not edit / delete the columns if its not applicable 3. Send soft copy to the mahaseac@gmail.com and seiaa.mah@gmail.com in the word format (doc file)

Sr.No. 1. 2.

Particular Name of Project Name, contact number & address of Proponent

Commitment On

3.

Name, contact number & address of Consultant

4.

Accreditation of consultant (NABET Accreditation) Type of project: Housing project / Industrial Estate / SRA scheme / MHADA / Township or others Location of the project Whether in Corporation / Municipal / other area Applicability of the DCR Note on the initiated work (If applicable)

Name: Address: Telephone number: Mobile number: Email ID: Name: Address: Telephone number: Mobile number: Email ID: QCI NABET List for the construction project / Area development project / Township

5.

6. 7.

8 9

Total constructed work (FSI+ Non FSI) Date and area details in the necessary approvals issued by

10

11

the competent authority (attach scan copies) LOI / NOC from MHADA Date and construction area details mentioned in the approved letter / Other approvals (If applicable) Total Plot Area (sq. m.) Deductions Net Plot area Permissible FSI (including TDR etc.) Proposed Built-up Area (FSI & Non-FSI) Ground-coverage Percentage (%) (Note: Percentage of plot not open to sky) Estimated cost of the project No. of building & its configuration(s) Number of tenants and shops Number of expected residents / users Tenant density per hector Height of the building(s) Right of way (Width of the road from the nearest fire station to the proposed building(s)) Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation Existing structure(s) Details of the demolition with disposal (If FSI area (sq. m.): Non FSI area (sq. m.): Total BUA area (sq. m.):

12

13

14

15

16

17 18 19 20 21

22

23 24

25

applicable) Total Water Requirement

Dry season: Fresh water (CMD): & Source: Recycled water (CMD): Total Water Requirement (CMD): Swimming pool make up (Cum): Fire fighting (Cum): Wet Season: Fresh water (CMD): & Source: Recycled water (CMD): Total Water Requirement (CMD): Swimming pool make up (CMD): Fire fighting (CMD):

26

Rain Water Harvesting (RWH)

Level of the Ground water table Size and no of RWH tank(s) and Quantity Location of the RWH tank(s) Size, no of recharge pits and Quantity Budgetary allocation (Capital cost and O&M cost)

27 28

UGT tanks Storm water drainage

Location(s) of the UGT tank(s) Natural water drainage pattern quantity of storm water Size of SWD Sewage generation (CMD) STP technology Capacity of STP (CMD) Location of the STP DG sets (during emergency) Budgetary allocation (Capital cost and O&M cost) Waste generation in the Pre Construction and Construction phase: Waste generation Quantity of the top soil to be preserved Disposal of the construction way debris Waste generation in the operation Phase: Dry waste (Kg/day): Wet waste (Kg/day): E waste (Kg/month): Hazardous waste (Kg/month): Biomedical waste (Kg/month) (If applicable):

29

Sewage and Waste water

30

Solid waste Management

STP Sludge (Dry sludge) (Kg/day):

Mode of Disposal of waste: Dry waste: Wet waste: E waste: Hazardous waste: Biomedical waste (If applicable): STP Sludge (Dry sludge): Area requirement: 1. Location(s) and total area provided for the storage and treatment of the solid waste: Budgetary allocation (Capital cost and O&M cost) Total RG area: 1. RG area other than green belt (Please specify for playground, etc.) 2. RG area under green belt: RG on the ground (sq. m.) RG on the podium (sq. m.) 3. Plantation: Number and list of trees species to be planted in the ground RG: Number and list of shrubs and bushes species to be planted in the podium RG: Number and list of trees species to be planted around the border of nallah / stream / pond (If any): Number, size, age and species of trees to be cut, trees to be transplanted NOC for the Tree cutting / transplantation/ compensatory plantation, if any 4. Budgetary allocation (Capital cost and O&M cost) Power supply: Maximum demand Connected load Source Energy saving by non-conventional method: Energy saving measures Detail calculations & % of saving Compliance of the ECBC guidelines: (Yes / No) (If yes then

31

Green Belt Development

32

Energy

submit compliance in tabular form) Budgetary allocation (Capital cost and O&M cost)

33

Environmental Management plan Budgetary Allocation

DG Set: Number and capacity of the DG sets to be used Type of fuel used Construction phase (with Break-up): Capital cost O & M cost (Please ensure manpower and other details) Operation Phase (with Break-up) Capital cost O&M cost (Please ensure manpower and other details) Quantum and generation of Corpus fund and Commitment Responsibility for further O &M

34

Traffic Management

Nos. of the junction to the main road & design of confluence Parking details: Number and area of basement Number and area of podia Total Parking area Area per car 2-Wheelar 4-Wheeler Public Transport Width of all Internal roads (m):

35 36

CRZ/RRZ clearance obtain ,if any Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas / inter-State boundaries Check list for the other necessary approvals Status of the approval Name of the competent authority Date of the issued letter

37 38

39

CFO NOC for the above said building structure(s) HRC NOC for the above said building structure(s) (If applicable) NOC for the above said

40 41 42

43

44 45

building structure(s) from the Aviation authority (If applicable) Consent for the water for the above said detail(s) Consent for the drainage for the above said detail(s) Consent for the electric supply for the proposed demand Precertification for Green Building from Indian Green Building Council and other recognized institutes (If applicable) Court Order (If applicable) Other approvals (If any)

Declaration

I hereby declare that no work has been initiated for the said project. Date :

Name & Signature of the project proponent

Name & Signature of the consultant

Summary of project proposals

1. Plot area 2. Total built up area 3. FSI consumed 4. Nos. of building 5. Maximum height of building 6. Area and nos. of the basement 7. Area and nos. of podium 8. Area of amenity space 9. Nos. of phases for project execution 10. Expected nos. of residents /users