Professional Documents
Culture Documents
When?
Drilling Liners Production Liners Extended Reach Liners Large Monobore Liners Open Hole Completions Permanent Packers Wash and Ream Drill-In Lost Circulation
Where?
Mature Fields HTHP Deepwater In-Fill Drilling Exploration
Why VersaFlex?
Gas Tight Reliable Liner Top Seal Simplified Hardware Ability to Wash and Ream Better Cement Job Reduced Rig Time to Deploy and Get Production into the Pipeline Reliable Results
Well 1- Reciprocated
Well 2 No Recip.
Well 3 Recip.
Planning is Critical!
Running calculations
Temperature Range
Top of Liner 100 F to 320 F BHST 100 F to 386 F
Blocks fell uncontrolled for 12 ft Washed at least one elastomer element off tool Gas flaring throughout installation
Challenges
Ream past tight spot ~16,000 ft
20-40 RPM 5K # WOB >400 ft in 3 hrs
Challenges
Environment North Sea Shallow Liner Top Require Gas Tight seal Depth > 9,200ft High angle Liner Top > 2,600 ft 100 at Shoe Deviated Horizontal 22 at the TOL Liner 9-5/8 x 13-3/8 Pumping Issues
Bridging Loses during circulation Loses during cementing
Successfully deployed Successfully tested to 4,000 psi and 90K overpull Successfully deployed 2 more liners under similar conditions. Negotiated 3 year contract
Service Locations: New Iberia, LA Alvarado, TX Q106 Reforma, Mexico Caracus, Venezuela Coco, Ecuador Stavanger, Norway Aberdeen, Scotland Port Harcourt, Nigeria Al Khobar, SA Dubai, UAE Q106 HMC, Vietnam KL, Malaysia Q206 Perth, Australia
Hanger Sizes
5-1/2 x 7 23-35 ppf 5-1/2 x 7-5/8 29.7 39 ppf 7-5/8 x 9-5/8 36-53.5 ppf 7-5/8 x 9-7/8 62.4 ppf 11-3/4 x 13-3/8 61-72 ppf 11-3/4 x 13-5/8 88.2 ppf
Development Efforts
Full Range of CRA Hangers
13cr equivalent Severe sour service Full ISO 14310 testing
Additional Sizes
3-1/2 x 5-1/2 8-5/8 x 10-3/4 9-5/8 x 11-3/4
Sand Control Hybrid Project Complete AMS / BDMI Packaging Substantial FEA Modeling