You are on page 1of 13

National Master Plan for Wastewater, Botswana (2003)

Project Scope
Evaluate wastewater generation and disposal Assess sanitation facilities and their impacts on environment Develop strategies for wastewater management Develop a master plan for planning horizon up to 2027 Contract value US$ 1.35m

Our Role
Assessment of flows and loads Review of national wastewater guidelines and design criteria Review of legislation on industrial effluent and trade waste Preparation of draft Wastewater and Sanitation Act Review of institutional framework Development of master plan and preparation of staged 25-year implementation schedule

Lower Ruvu and Morogoro Water Supply, Tanzania (2009-2011)


Project Scope
Expand Lower Ruvu WTP capacity Improve and extend water supply services in Dar es Salaam Upgrade Morogoro water supply system WTP, pump station, transmission pipelines, water storage resevoirs Contract value US$ 2.2m

Our Role
Design and bidding documents Topographic survey ands oil investigation Hydraulic modelling, hydraulic testing and survey Economic and financial analysis Environmental and social impact assessment Updating of engineering design Preparation of pre-qual and tender documents

Chimoio, Manica & Gondola Water Supply, Mozambique (2009-2012)


Project Scope
Design review and construction supervision of Water intake extension, new water treatment plant, pump stations, water storage tanks and water transmission, distribution and reticulation systems for 3 cities

Our Role
Review of contractors design , drawings and equipments Management of design programme Assessment of environmental and social impacts Monitoring of construction progress Quality control and assurance Review of contractors interim payment statements Management of testing and commissioning Assistance to client during defects and liability period

Lilongwe Water Supply, Malawi (2013-2016)


Project Scope
Inception study; Detailed Design of Raw Water Conveyance System (intake weir, sedimentation basin, 12km pipeline, etc) Construction Supervision Additional work included; Training of counterparts in hydraulic modelling.

Our Role / Services


Hydrology; Engineering; Geotechnical; Assistance to Client during Bidding Process Construction Supervision; Project Management and client liaison

Nairobi Water & Sewerage Capacity Building, Kenya (07-08)


Project Scope
Assist in the institutional development aimed towards a modern, efficient and effective organization Establish modern management systems Provide training and capacity building Contract value US$ 1.4m

Our Role
Management of institutional development activities Oversight of implementation of financial management module Assistance in financial forecasting and budgeting Establishment of environmental management plans Provision of training and transfer of knowledge Assistance in management of the whole project procurement cycle

Integrated Catchment Management Project, Lesotho (2005-2010)


Project Scope
Establish catchment management authorities for 5 catchments Prepare a natural resources inventory Develop integrated catchment management plans Implementation of the management plan on pilot areas Contract value US$ 3.1m

Our Role
Review of organisational arrangement of stakeholders and recommendation of institutional structures Preparation of resources inventories and GIS mapping Preparation of social/community development plans Development of integrated catchment management plans and implementation of monitoring programme Project management and reporting

Integrated WRM&D Study for Pangani Basin, Tanzania (2012-2013)


Project Scope
Conduct studies and prepare integrated water resources management and development plan for the Pangani Basin

Our Role
Hydrological studies and modeling Groundwater and conjunctive use studies and modeling River health and social/ environmental needs assessment Water quality studies and modeling Sector water plans (Hydropower, Irrigation, Mining, Livestock, Rural Water Supply, Urban Water Supply, etc) Flood and irrigation studies Arusha future water supply study Integrated Water Resources Management Basin Plan Water Resources Information Management System Decision Support System Transboundary Water Management Climate change assessment Institutional and legal framework Capacity building and training

Integrated WRM&D Study for Lake Tanganyika Basin, Tanzania (2012-2013)


Project Scope
Conduct studies and prepare integrated water resources management and development plan for the Lake Tanganyika Basin

Our Role

Hydrological studies and modeling Groundwater and conjunctive use studies and modeling River health and social/ environmental needs assessment Water quality studies and modeling Sector water plans (Hydropower, Irrigation, Mining, Livestock, Rural Water Supply, Urban Water Supply, etc) Lake Tanganyika Water Balance Assessment Integrated Water Resources Management Basin Plan Water Resources Information Management System Decision Support System Transboundary Water Management Climate change assessment Institutional and legal framework Capacity building and training

Rajasthan Urban Water Supply Upgrading, India (10-12)


Project Scope
Assess performance and operational status of all 222 urban water supply schemes in Rajasthan to facilitate policy decision making for improvement in service delivery through judicious deployment of scarce resources Prepare Roadmap and investment plan for year 2045.
Increasing domestic, commercial and environmental water demand

Our Role
Preparation of web-based GIS water supply asset maps Hydraulic modelling of all 222 towns water supply system Energy audit of 650 pump stations NRW assessment Conjunctive water use assessment including reuse of wastewater Develop time bound roadmap for meeting water demand in 2045

Kuwait Stormwater Drainage Master Plan (07-10)

Phase 1: Data Collection and Mapping Phase 2: Hydraulic Modelling Phase 3: Preparation of Master Plan

Typical Project: Preparation of Basin Plans for Ghaghra Gomti System, Uttar Pradesh Developed Decision Support System
Modelling of current/future scenarios Stakeholder consultation
23000 22000

Kishanpur Mr.

Gross Margin (Rs/per Ha CA)

21000 20000 19000 18000 17000 16000 15000 main canal desilting whole system desilting whole system lining

Bhuwalpur Mr.

Major Water Supply Projects in Australia


Sydney Melbourne Adelaide

2007 2010 250ML/d Independent Verifier

2009 2012 550ML/d Proof Engineering

2009 2012 275ML/d Designer

Thank You

You might also like