METHOD OF BUILDING
ESTIMATE
METHODS OF BUILDING
ESTIMATE
Method 1-Long wall or Short wall
method.
Method 2-Centre line method.
Solution
Length of long wall Centre to
Centre=5+.5*.3+.5*.3=5.30 cm.
Length of short wall Centre to
Centre=4+.5*.3+.5*.3=4.3 cm.
Earthwork in excavation in
foundation
Lime concrete in foundation
1st class brickwork in cement mortar
1:6 in foundation and plinth.
2.5 cm c.c. DPC
1st class brickwork in lime mortar in
superstructure.
Solution
Earthwork in excavation in
foundation
Lime concrete in foundation
1st class brickwork in cement mortar
1:6 in foundation and plinth.
2.5 cm c.c. DPC
1st class brickwork in lime mortar in
superstructure.
POINTS TO REMEMBER
For buildings having partition walls, for every
junction of partition walls with main walls half
breadth of the respective footing is to be
deducted from the total Centre length.
Building with one partition wall having two
junctions, for earthwork in foundation deduct
one breadth.
For building having different types of walls ,each
set of walls shall have to be dealt separately.
At the corner of the building where two walls are
meeting no subtraction or addition is required.
SOLUTION
Total Centre length of
walls=AB+BC+CD+DA=5.30+4.30+5.30+4.30=1
9.20 m
Note-If the total length is multiplied by the
breadth and the depth we get the quantity of
earthwork in excavation.
Note-Portions P,Q,R and S marked with double
hatch lines come twice while portions K,L,M an N
left blank do not come at all, but these portions
being equal in magnitude, we get the correct
quantity.
Solution
Earthwork in excavation in
foundation.
Lime concrete in foundation
1st class brickwork mortar 1:6 in
foundation and plinth.
2.5 cm c.c. DPC.
1st class brickwork in lime mortar in
superstructure.
ASSIGNMENT 3