PRESENTATION JULY2015
MECHANICAL MAINTENANCE(CPP)
1. Safety Update
2. Department KPIs
PM compliance
CBM Compliance
Equipment Maintenance based on CBM
Oil Consumption
Equipment Breakdown
Training
3. Modifications / Improvements
4. Major works done
SAFETY UPDATE
Safety Points
Jul-15
YTD
Identified
Closed
Identified
Closed
60
55
49
18
30
90
55
Venue
Total
No. of attendees
60
51
20
27
158
PM COMPLIANCE
plan
100
Actual
100
100
100
99
99.8
CBM COMPLIANCE
PLAN
100
100
100
ACTUAL
100
100
100
16
EQUIPMENT
CORRECTED
14
(#1&2)CONDENSAT
8
WATER
PUMP-2
(#1&2)CONDENSAT
WATER PUMP-3
FD FAN-1B LOP-A
PA FAN-2B LOP-B
DMCCW-1A
DMCCW-1A
SEAL AIR FAN-2B
PA FAN-2B LOP-A
3152
1716.5
1858
2364.5
EQUIPMENT BREAKDOWN
3
EQUIPMENT
BREAKDOWN
1
BOILER FILL
PUMP-1
LDO
FORWARDING
PUMP-2
HP BYPASS V/V
SPRAY CONTROL
VALVE-#2
SERVICE BILL
7,372,326
6,930,363
4,361,300
3,887,027
3,383,743
2,844,968
ADITYA ALUMINIUM
CPP(6x150MW)
BREAK DOWN ANALYSIS REPORT
CPP/MMD/FY-2015/16-014
Analysis Report:
1-Analysis has been done and found that 1 allen bolt was defective (has sheared) from the beginning. The rest of the
Allen bolts have sheared subsequently during the valve operation. (as 1 Allen bolt has failed, additional load was on
the rest of the allen bolts)
2-Spring washers as mentioned in the drawing , were not provided to absorb the jerks and sudden loads.
Corrective Measures:
1-Damaged Allen bolts were replaced with new bolts.
2-8 mm spring washers to be installed in each and every bolt in all HPBP systems in Unit 1, 2 , 3, 4 & 5 by 25 Jul 15
3-Now it is running normal with out any jerk and oil leakage.
Sunil sahoo
Sreenivas peri
jagadish patra
Concerned Engineer
Reporting Manager
Head of Dept.
DEPARTMENTAL TRAINING
190
174
123
118
92
68
33
TARGET
ACHIEVED
MAJOR MODIFICATION
GENERATOR FRONT
GENERATOR REAR
MAJOR MODIFICATION
SERVICE WATER PUMP BEFORE AND AFTER MODIFICATION