Professional Documents
Culture Documents
EXCEL IMPORT
IN
RTUtil NT SOFTWARE
STEP - 1
First create the pattern file in RTUtil NT
software according to Hardware
configuration requirement and save as in
Pattern folder.
Create pattern file considering network tree
required as per IEC 101 protocol.
Put Link Address and ASDU address as per given from SCADA.
Create the Hardware tree as per RTU configuration.
Signal tree should be empty.
Save file as station name in Patterns folder as shown.
Save file as station name in Patterns folder as shown.
STEP - 2
Create an EXCEL import file as per wiring
schedule and hardware configuration
details.
In EXCEL import file Signals contains with
all DI (SPI & DPI), AI (AMI) and AO
(ASO).
RTU Hardware address has to be filled up as per
Control wiring schedule in Signals for DCO.
RTU Hardware address has to be filled up as per DI
wiring schedule in Signals for DPI.
RTU Hardware address has to be filled up as per DI
wiring schedule in Signals for SPI.
RTU Hardware address has to be filled up as per
Analog wiring schedule in Signals for AMI.
RTU Hardware address has to be filled up as per
Analog Control wiring schedule in Signals for ASO.
STEP - 3
Save Excel file after completion in EXCEL
import folder of RTUtil NT.
Rakshit D Patel
Project Engineer
PS-NM, ABB Ltd.
Mob : 9008755773