HAMAD BIN KHALIFA MEDICAL CITY

AGENDA:
Hamad Bin Khalifa Medical City Hospital Introduction
Basic Electrical Services
Generator System
Electrical Power System and Sequence of Operation
HAMAD BIN KHALIFA MEDICAL CITY

The new hospitals the Qatar Rehabilitation


Institute ,an Ambulatory Care Center, and the
Womens Wellness and Research Center will
create more than 500 additional beds for patients

It has been overseeing the development of the


250,000-square-meter space site in Rumailah in
central Doha with a cost of QR2.4 billion, which
has been led by Korean-based Hyundai
Engineering and Construction Co.
HAMAD BIN KHALIFA MEDICAL CITY

The project also includes the main kitchen for


the new medical city, with a capacity for
delivering 8,000 meals a day and a robotic
pharmacy.
The facilities incorporate 21 operating theatres,
designed for long-term flexibility, safe
operations and optimized construction space.
The design also responds to the objective of
lowering risk of injury to patients.
QATAR REHABILITATION INSTITUTE

The Qatar Rehabilitation Institute will offer a range of specialized


services including physiotherapy, occupational and speech
therapy, prosthetics and orthotics.

The institute will have approximately 200 beds as well as an


adult hydrotherapy suite. Additionally, there will be outpatient
clinics for occupational therapy, prosthesis, organ
transplantation and inpatient therapy support.

The outpatient physical therapy facilities include:


12 treatment rooms;
4 gyms;
A group therapy room; and
A suite for education and support services.
AMBULATORY CARE CENTER

The Ambulatory Care Center will provide outpatient care


and minor surgery for adults who do not require an
overnight stay.

This center has 116 beds and 14 operating theatres with


recovery rooms and support.
It also includes radiology and examination suites, as well
as treatment rooms and 12 examination rooms for ENT
(ear, nose and throat) audiology.
The Qatar National Diabetes Center will also be housed in
the building. It will have more than 30 examination rooms
and more than 50 short-stay room.
WOMENS WELLNESS ANS RESEARCH CENTER

The Womens Wellness and Research Center will create


much-needed additional provision for pregnant women in
Qatar.

The hospital will have approximately 200 beds and 53


neonatal intensive care cots.
It include 7 operating theatres, 21 delivery rooms and 60
outpatient rooms.
It will have a full accident and emergency department with
a series of rooms for Caesarean section deliveries, triage,
ultrasound, treatment rooms and rooms for emergency
deliveries.
It previously said that the hospital will have capacity
for 15,000 births a year.
AGENDA:
Hamad Bin Khalifa Medical City Hospital Introduction
Basic Electrical Services
Generator System
Electrical Power System and Sequence of Operation
LV System Equipment

Hamad Bin Khalifa Medical City Hospital are


consists of the following Electrical Equipment;

EQUIPMENT QRI ACC WWRC


TRANSFORMER 7 5 8
GENERATOR 2 2 2
MDB 7 5 8
EMDB 6 4 6
ATS 6 4 6

*Hospital Substation at Lower Level


ELECTRICAL PANELS

EQUIPMENT
S/N PMR AH WH LL TOTAL
DESCRIPTION
1 SMDB 14 23 41 29 107
2 ESMDB 16 39 38 22 115
3 DB/EDB/UPS 193 212 278 183 866
4 UPS-HICT 18 20 28 11 77
5 CBS 18 20 25 13 76
6 MCP 63 87 336 88 574
TOTAL PANELS 322 401 746 346 1815
Building Automation System

S/N Description Qty

1 Fan Coil Unit (FCU) 1,045


2 VAV(EAB,FAB,SAB) 947
3 DDC panel 175
4 Air Handle Unit (AHU) , Outdoor Air Unit (OAU) 314
5 FAN 374
6 Point 54,500
UPS System

QRI WWRC ACC HIS


UPS Capacity / CEP
(Lower (Lower (Lower (Lower Total
Models Rating Building
Level) Level) Level) Level)
MGE 60 KVA 4 nos. 2 nos. 6 nos.
Galaxy
5000 80 KVA 4 nos. 4 nos.

160 KVA 2 nos. 2 nos.

200 KVA 4 nos. 4 nos. 8 nos.


MGE
Galaxy 250KVA 2 nos. 2 nos.
7000
300 KVA 2 nos 2 nos.

500 KVA 6nos. 6 nos.


IPS System

TOTAL
S/N DESCRIPTION ACC WWRC 10
5kVA
kVA
Isolation Panel with 17
1 17
10 branch circuit, 5kva nos.
Isolation Panel with 18 15
2 15
branch circuit , 10kva nos.
Isolation Panel with 10
3 32 nos. 32
branch circuit, 5kva
Isolation Panel with 16
4 8 nos. 8
branch circuit , 10kva
Isolation Panel with 18
5 7 nos. 7
branch circuit , 10kva

TOTAL 32 47 79
BHU/PENDANT SYSTEM
Building BHU Type Quantity BuildingBHU Type Quantity Building Pendant Type Quantity
A2-1 4 Flu - B 176 J6-1A 2
B1 10 Flu - C(Q) 24 J6-1B 6
Flu - A 210 Flu - C(R) 24 J6-1C 2
M1 0 M1 93 J6-1D 2
PMR
QRI AH
ACC
M1-1 1 M1-1 2 J6-1G 1
M1-2 1 M1-6 1 J6-2A 2
M1-3 18 N-1 7 J6-2B 1
P-2 6
WWRC
WH
N-2 9 J7-1A 2
TOTAL 250 N-3 2 TOTAL 18
O 6
Building BHU Type Quantity Building
Pendant Type Quantity
O1-1 32
B2 32 J6-1E 1
P 13
Flu - A 64 P1(SABS) 21 J6-1F 4
M1 125 PMP 3 J6-4 1
M1-1 1 TOTAL 413 J7-1 1
WH
WWRC
M1-4 2 J7-2 2
ACC
AH M1-5 2 Building BHU Type Quantity J7-2A 14
O 2 A2 3 J7-3A 19
LL
P 42 M1-1 7 J7-4 4
P-1 20 TOTAL 10 TOTAL 46
P1(SABS/SRS) 2
P1-1 2
TOTAL 294 TOTAL BHU 967 UNITS TOTAL PENDANT64 UNITS
ELEVATOR SYSTEM
No of No. of No. of
Elevator Capacity Speed Elevator Capacity Speed Elevator Capacity Speed
Stops Stops Stops
105 mpm 105 mpm
PMR-31 10 2500 kg 60pm CHL-3 13 2500 kg
(1.75m/s) POD-1 5 2500 kg (1.75m/s)
(1m/s)
105 mpm 105 mpm
PMR-33 10 2500 kg 60pm CHL-4 13 2500 kg
(1.75m/s) POD-2 6 2500 kg (1.75m/s)
(1m/s)
105 mpm 105 mpm
PMR-34 10 2500 kg 60pm CHL-5 13 2500 kg
(1.75m/s) POD-15 5 2500 kg (1.75m/s)
(1m/s)
105 mpm 105 mpm
PMR-32 11 2500 kg 60pm CHL-6 13 2500 kg
(1.75m/s) POD-16 5 2500 kg (1.75m/s)
(1m/s)
105 mpm 105 mpm
PMR-35 11 2500 kg 105 mpm CHL-7 13 2500 kg
(1.75m/s) ORT-20 12 2500 kg (1.75m/s)
(1.75m/s)
105 mpm 105 mpm
PMR-28 10 2500 kg 105 mpm CHL-8 13 2500 kg
(1.75m/s) ORT-22 11 2500 kg (1.75m/s)
(1.75m/s)
105 mpm 105 mpm
PMR-29 10 2500 kg 105 mpm CHL-9 14 2500 kg
(1.75m/s) ORT-21 11 2500 kg (1.75m/s)
105 mpm
(1.75m/s)
PMR-30 10 2500 kg 105 mpm
105 mpm CHL-10 14 2500 kg
(1.75m/s) ORT-23 11 2500 kg (1.75m/s)
60 mpm (1.75m/s)
PMR-40 3 2500 kg 60 mpm
105 mpm POD-11 3 2500 kg
(1m/s) ORT-24 11 2500 kg (1m/s)
105 mpm (1.75m/s)
PMR-25 4 2500 kg 60 mpm
(1.75m/s) 105 mpm POD-12 3 2500 kg
ORT-17 11 2500 kg (1m/s)
105 mpm (1.75m/s)
PMR-26 4 2500 kg 60 mpm
(1.75m/s) 105 mpm POD-13 4 2500 kg
ORT-18 11 2500 kg (1m/s)
105 mpm (1.75m/s)
PMR-27 4 2500 kg 105 mpm
(1.75m/s) ORT-19 11 2500 kg
(1.75m/s)
60 mpm
*Fireman Lift POD-14 2 2500 kg
(1m/s)

QRI 12 ELEVATOR ACC 13 ELEVATOR WWRC 11 ELEVATOR


LIGHTING SYSTEM

NORMAL LIGHT
(KAHRAMAA POWER)

SELF CONTAINED BATTERY LIGHT


(BATTERY PACKS-NORMAL POWER)

EMERGENCY LIGHT
(CENTRAL BATTERY SYSTEM-
EMERGENCY POWER)

EXIT LIGHT
(BATTERY PACKS-EMERGENCY POWER)
AGENDA:
Hamad Bin Khalifa Medical City Hospital Introduction
Basic Electrical Services
Generator System
Electrical Power System and Sequence of Operation
GENERATOR SYSTEM

POWERED BY:

CUMMINS
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM

Part 1 Part 2
GENERATOR SYSTEM

Part 1 Part 2
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR SYSTEM
GENERATOR TESTING

1. No-Load TEST
2. On-Load TEST
No-Load TEST Flowchart
START

KIND OF NO LOAD START


TESTING TEST CHECKLIST

YES NO
CHECKLIST
WITH LOAD TROUBLESHOOT
A COMPLIED?
TEST

YES
PROBLEM
LOG-IN TO DMC
RESOLVED?

START THE NO
GENERATOR PUT TAGGING
NOT TO OPERATE
RECORD
PARAMETERS
CONTACT SERVICE
CHECK THE
PROVIDER
GENERATOR FOR ANY
ABNORMALITIES

SHUTDOWN THE CHECK THE


GENERATOR FOR END
GENERATOR ANY LEAK
On-Load TEST Flowchart
START
A
CHECKLIST

YES CHECKLIST NO
TROUBLESHOOT B
COMPLIED?

LOG-IN TO DMC YES PROBLEM


RESOLVED?
TURN-OFF THE
ATS BREAKER NO
FROM THE MDB PUT TAGGING
NOT TO OPERATE
GENERATOR NO
B
START?
CONTACT SERVICE
YES PROVIDER
RECORD
PARAMETERS

CHECK THE CHECK THE


SHUTDOWN THE
GENERATOR FOR ANY GENERATOR FOR END
ABNORMALITIES GENERATOR ANY LEAK
AGENDA:
Hamad Bin Khalifa Medical City Hospital Introduction
Basic Electrical Services
Generator System
Electrical Power System and Sequence of Operation
HIGH VOLTAGE LAYOUT

11kV/.415kV
Hosp. Substation
11kV/.415kV
QRI Substation

66kV/11kV
KM Substation
ELECTRICAL SYSTEM
66kV/11kV

11kV
HV Switchgear
ELECTRICAL
6.6kV SWGR
6.6kV ROOMS
& MCP Panel
TX 11kV/.415kV
ELECTRICAL Transformer
ROOMS
UPS
MDB
PANEL

ATS EMDB
PANEL
ELECTRICAL SYSTEM

ELECTRICAL
ROOMS

UPS

ATS EMDB
PANEL
ELECTRICAL SYSTEM

ELECTRICAL
ROOMS

UPS

2000 kVA
Generator

GCP ATS EMDB


PANEL
ELECTRICAL SYSTEM
66kV/11kV

11kV
HV Switchgear
ELECTRICAL
6.6kV ROOMS
TX 11kV/.415kV
ELECTRICAL Transformer
ROOMS
UPS
MDB
2000 kVA PANEL
Generator

GCP ATS EMDB


PANEL
SUBSTATION LAYOUT AND NORMAL OPERATION

11kV HOSPITAL SUBSTATION


GENERATOR
ROOM

MDB-3
TR-3 ATS-3
G1
G2

G3 G4

11kV/.415V WWRC MDB 11kV/.415V ACC MDB


TX ROOM ROOM TX ROOM ROOM
G1
A-EMDB-3 G2
UPS PANEL GCP ROOM
G3
G4
SUBSTATION LAYOUT AND EMERGENCY OPERATION

11kV HOSPITAL SUBSTATION


GENERATOR
ROOM

G1
G2

MDB-3
TR-3 ATS-3
G3
G4

11kV/.415V WWRC MDB 11kV/.415V ACC MDB


TX ROOM ROOM TX ROOM ROOM
G1
A-EMDB-3 G2
UPS PANEL GCP ROOM
G3
G4
Normal Power Operation

DMC
LOADS
Emergency Power Operation

DMC
LOADS
G G
HAMAD BIN KHALIFA MEDICAL CITY

BASIC LOCATION
(QRI)
QRI BUILDING Ground Floor
- Elevator
- Elec/Comm Room
- Fireman Elevator

Elec. Room

Comm. Room

Elevator
Fire Control Room
Fireman Lift

Security Room

Comm. Room Elec. Room


HAMAD BIN KHALIFA MEDICAL CITY

BASIC LOCATION
(ACC)
ACC BUILDING Ground Floor
- Elevator *POD-1
- Elec/Comm Room POD-2
- Fireman Elevator POD-14
POD-15
Elec. Cabinet POD-16
Room
Comm. Room
Elevator
Fireman Lift Elec. Room

Comm. Room
Elec. Room

Fire Control Room

Elec. Cabinet Room

Security Room
HAMAD BIN KHALIFA MEDICAL CITY

BASIC LOCATION
(WWRC)
WWRC BUILDING Ground Floor
- Elevator
*POD-11
- Elec/Comm Room
- Fireman Elevator Elevator
Fireman Lift
Elec. Room
Comm. Room

Elec. Room
Comm. Room

Security Room Fire Control