You are on page 1of 113

TES KONSOLIDASI

(CONSOLIDATION TEST)
References:

 ASTM D2435: “Standard Test Method for One-


Dimensional Consolidation Properties of Soils”.
 Holtz and Kovacs. (1981). An Introduction to
Geotechnical Engineering, Chaps 8 and 9.
TES KONSOLIDASI
(CONSOLIDATION TEST)
Objective:

The consolidation test is used to determine:


 Cc (compression index)

 Cs (swelling index)

 ’p (pre-consolidation pressure)

 Cv (coefficient of consolidation)

 C (secondary compression coefficient)


TES KONSOLIDASI
(CONSOLIDATION TEST)
Equipment:
 Consolidation loading device
TES KONSOLIDASI
(CONSOLIDATION TEST)
Equipment:

 Consolidation cells
Can be used for
permeability test
TES KONSOLIDASI
(CONSOLIDATION TEST)
Equipment:

 Specimen trimmer and accessories


 Device for placing specimen in container
 Balance sensitive to 0.1 g
 Drying oven
 Displacement transducer
 Timer
 Moisture content cans
TES KONSOLIDASI
(CONSOLIDATION TEST)
Test procedure:
TES KONSOLIDASI
(CONSOLIDATION TEST)
Test procedure:
TES KONSOLIDASI
(CONSOLIDATION TEST)
Test procedure:

1600

Loading
sequence should
encompass the
800
smallest and
largest effective
stresses in the 400 400
field, which 200
depends on 100
50 50
depth, foundation
loads and
excavations
TES KONSOLIDASI
(CONSOLIDATION TEST)
Procedure:
 Measure the weight Wring and diameter D of consolidation ring
 Measure the initial height h0 and the weight Ww0 of the initial
specimen and ring
 Mount the consolidation cell in the loading unit
 Adjust the loading pressure to the first value of the pressure series
and measure the vertical displacement at selected intervals
 After 24h, or after U exceed 90%, the applied load can be changed
to its next value
 Repeat the step above until all the loading steps are completed
 After unloading the specimen completely, record the final dial
reading
 Quickly dismantle the consolidometer cell and weight the wet
sample
 Dry the specimen, measure its dry weight Wd
TES KONSOLIDASI
(CONSOLIDATION TEST)
Test procedure:

Time intervals for reading:


0, 0.1, 0.25, 0.5, 1, 2, 4, 8,
15, 30, 60 min
and 2, 4, 8, 24 hours
Gs 
 df
 w  w f  df
TES KONSOLIDASI
(CONSOLIDATION TEST)
Computation:

 Initial state: Ww0  Wd


w0   100 (%)
 water content w0 Wd  Wring

Gs w  df  d 0h0
 void ratio e0 e0  1 Gs   df 
 d0  w  w f  df hf

Gs w0
 degree of saturation Sr0 Sr 0 
e0

initial dry unit weight d0 Wd  Wring


  d0 
V0
Gs 
 df
 w  w f  df
TES KONSOLIDASI
(CONSOLIDATION TEST)
Computation:

 Amplitude of settlement:
 Sample height h at time t is h  h0  d0  d (t )  hc ( )

h0  h
 void ratio e e  e0  (1  e0 )
h0
Gs 
 df
 w  w f  df
TES KONSOLIDASI
(CONSOLIDATION TEST)
Example:
 df
Gs 
 w  w f  df

TES KONSOLIDASI
(CONSOLIDATION TEST)

Example:
Gs 
 df
 w  w f  df
TES KONSOLIDASI
(CONSOLIDATION TEST)
Example:
Gs 
 df
 w  w f  df
TES KONSOLIDASI
(CONSOLIDATION TEST)

Kerjakan latihan hal 356,


EXPERIMENTAL SOIL MECHANICS,
Jean-Pierre Bardet
 df
Gs 
 w  w f  df
TES KONSOLIDASI
(CONSOLIDATION TEST)

PENGAMATAN KONSOLIDASI
DI LAPANGAN
PE 2947.185
PN 2960.931

PE 3095.437
ELEVASI LAPANGAN
DAN DATA ELEVASI
100.00 PN 2918.971

99.50

.50 99.0
0 BV-3 99.00 

99 Elv. 99.990 DC-5 
 


98.50 
Elv. 97.836
0
0.0

S-1 98.00
Elv. 98.351 

10

E 2895.398 BV-7
N 2862.413
BV-10 Elv. 98.151
Elv. 100.053 DC-3

98.50


S-3 Elv. 97.832
S-2 Elv. 98.002 PE 3443.332
Elv. 98.208 BV-2 PN 2813.473
Elv. 98.950
99 S-4
.0 

Elv. 98.00

6
0

7
S-5

5
Elv. 97.525

13 9
98.00
BV-9
DC-4 Elv. 100.036
Elv. 99.454

0
BV-6

.5
98
Elv. 99.967
99 S-6
.5 S-7 PE 3298.758
0 Elv. 98.78 Elv. 98.118 PN 2773.936
BV-5 98.5
0 S-8

3
Elv. 100.640 99.00
Elv. 98.576

BV-1
Elv. 99.50 99.50
DC-2
PE 3155.543
PN 2683.010 Elv. 99.329 99.00 100.00
DC-1
Elv. 100.295
10

PE 3356.717
PN 2701.478
2.5

99.50 BV-8

.00
0

Elv. 100.539

100
BV-4
Elv. =....?


PE 3279.327


PN 2598.052









2 PE 3095.437
PN 2918.971

ELI PAD

BV-4 3m 3m 

 

DC-5 

1
LA
PE 2895.398 BV-10 7m 3m YD BV-7 9m 7m

3
PN 2862.413
OW
N
DC-6 AR DC-3
10m 4m
EA PE 3443.332
PN 2813.473
BV-2

BV-9
3.5m 3.5m
DC-4
BV-6
10m 4m
PE 3298.758
PN 2773.936

BV-3
3 BV-1

2
PE 3155.543
PN 2683.010
DC-2 DC-1
BV-8 2m 2m
PE 3356.717
PN 2701.478

Tidak dijumpai lapisan Tanah Lunak


BV-5

Dijumpai lapisan Tanah Lunak 1










PE 3279.327
Terdapat tanah organik


PN 2598.052








Tebal Tanah Lunak


Tebal Tanah organik
PE 2969.756
PN 3009.337

PE 2947.185
PN 2960.931 Ketebalan
No Bor Ketebalan tanah
tanah lunak
mesin organik (m)
2 PE 3095.437
PN 2918.971
(m)
BV-2 10 4
BV-3 
 
 

BV-6 10 4
DC-5 

1 LA S-1

4
8 BV-7 9 7

5
7 YD

3
BV-7
PE 2895.398
PN 2862.413
BV-10 OW

6
N BV-8 2 2
AR S-3 DC-3
DC-6 EA
8 PE 3443.332

BV-2
PN 2813.473 BV-9 3.5 3.5
S-2 7
S-4 BV-10 7 3
BV-9 S-5

DC-4
S-6 BV-6
S-7 PE 3298.758
PN 2773.936

S-8
BV-5
3

BV-1

2 

PE 3155.543
PN 2683.010
DC-2 DC-1
BV-8 PE 3356.717


PN 2701.478

5
BV-4


PE 3279.327


6
PN 2598.052









4

Tidak ditemukan lapisan tanah lunak KO


LA
M

Ditemukan lapisan tanah lunak


Tinggi timbunan dan surcharge yang diperlukan untuk mencapai
tinggi +100.000 saat serah terima pada akhir masa improvement.
PE 2947.185
PN 2960.931

PE 3095.437
PN 2918.971

HELI PAD

BV-4 
 
 
DC-5 



PE 2895.398 BV-10 BV-7


PN 2862.413

DC-3
DC-6
PE 3443.332
A, PN 2813.473

B,
BV-2 H+
H+ S =
C, S 3,5
= m
HBV-9
+S 3,0
= m
D, 2,0
DC-4
H+ m
E, S= BV-6
H+ 1,2 PE 3298.758

S= m
PN 2773.936

0,BV-3
6m BV-1

PE 3155.543 

PN 2683.010
DC-2 DC-1



BV-8
TI PE 3356.717



TA DAK
PN 2701.478

MB D
AH IPE BV-5
A N RL
TI UKA






MB


N






UN PE 3279.327

 
PN 2598.052






AN





Waktu (tahun)

0
0 2 4 6 8 10 12 14 16 18 20 22
Perhitungan Penurunan
0.1 Konsolidasi
0.2

0.3

0.4
Penurunan (m)

0.5

0.6 Settlement BV-2


0.7

0.8 (Zona A, timbunan 3,5m)


0.9
1160
1

1.1

1.2

1.3

Waktu (tahun)
0 2 4 6 8 10 12 14 16 18 20 22
0

0.1

0.2

0.3
Penurunan (m)

0.4 Settlement BV-6


0.5
(Zona B, timbunan 3,0m)
0.6 790
0.7

0.8

0.9
Soil Improvement Using Vertical Drain
Soil Improvement Using Vertical Drain
VERTICAL DRAIN DENGAN PRELOADING:
1. Mempercepat proses konsolidasi
2. Menaikkan kekuatan tanah akibat konsolidasi
Instrumentasi Pengamatan di Lapangan
Gambar 6. Koordinat sumur pompa

PP-03

PP-02

PP-01
Gambar 7. Data Piezometer 1

Pneumatic Piezometer PP-01


19
18
17

18 Agustus 2009
16 Mulai
pemompaan
15 Kedalaman piezometer -6,40m
Pore water pressure, mH2O

-10,40m
14 -15,50m
13

12 Juli 2009
12

1 Juli 2009
26 Juni 2009
18 Juni 2009

11
9 Juni 2009

10
2 Juni 2009

9
11 Mei 2009

8
7
timbunan 3,0m
2,8m
6
2,1m
5 1,8m
1,5m
0,9m
4 0,6m

3
0 10 20 30 40 50 60 70 80 90 100 110 120
Elapsed time, days
Data Piezometer 1
 Tinggi timbunan = 2m
 Kedalaman sumur pompa = 12 m
 Kedalaman/panjang vertical Drain = 7m

Kedalaman Selisih tekanan Selisih tekanan % penurunan


(meter) maksimum dan maksimum dan (derajat konsolidasi)
minimum pengukuran
(Bar) terakhir (Bar)
Tip 1 ( 5 meter ) 3.40 3.20 97.06 %

Tip 2 ( 10 meter ) 3.60 3.30 91.67 %

Tip 3 ( 15 meter ) 2.80 0.70 25 %


Gambar 8. Data Piezometer 2
19
Pneumatic Piezometer PP-02
Kedalaman
piezometer -8.7m
18
-10.90m
-13.20m
17

18 Agustus 2009
Pore water pressure, mH2O

16 Mulai
pemompaan
15
6 Juni 2009

14
11 Juni 2009

13
8 Juni 2009

break
6 Juli 2009
1 Juli 2009
22 Juni 2009

12
4 Juni 2009
26 Mei 2009

11
3,3m
timbunan 3,0m
10 2,1m 2,4m
1,8m
1,5
9 0,9
1,2
0,6m

8
0 10 20 30 40 50 60 70 80 90 100105
Elapsed time, days
Data Piezometer 2
 Tinggi timbunan = 3m
 Kedalaman sumur pompa = 12 m
 Kedalaman/panjang vertical Drain = 15m (?)

Kedalaman Selisih tekanan Selisih tekanan % penurunan


(meter) maksimum dan maksimum dan (derajat konsolidasi)
minimum pengukuran
(Bar) terakhir (Bar)
Tip 1 ( 5 meter ) 5.80 5.60 96.55%

Tip 2 ( 10 meter ) 4.80 2.40 50 %

Tip 3 ( 15 meter ) 4.90 1.20 24.49 %


Gambar 9. Data Piezometer 3
Pneumatic Piezometer PP-03
19
18
17 break

16
15
Pore water pressure, mH2O

Kedalaman piezometer -4,80m


14 Mulai
-9,40m
pemompaan
13 -15,70m

12

18 Agustus 2009
2 Agustus 2009
11

13 Juli 2009
19 Juni 2009
15 Juni 2009

26 Juni 2009
13 Juni 2009

10
9
5 Juni 2009
2 Juni 2009

8
26 Mei 2009

7
6 timbunan 3,3m
3,0m
5 2,4m
2,1m
1,8
4 1,5
1,2m
3 0,9
0,6m
2
0 10 20 30 40 50 60 70 80 90 100105
Elapsed time, days
Data Piezometer 3
 Tinggi timbunan = 3.5m
 Kedalaman sumur pompa = 12 m
 Kedalaman/panjang vertical Drain = 15m

Kedalaman Selisih tekanan Selisih tekanan % penurunan


(meter) maksimum dan maksimum dan (derajat konsolidasi)
minimum pengukuran
(Bar) terakhir (Bar)
Tip 1 ( 5 meter ) 3.60 1.00 28 %

Tip 2 ( 10 meter ) 3.80 1.20 31.58 %

Tip 3 ( 15 meter ) 1.60 1.30 81.25 %


(per 31 Agustus 2009)
TEORI ASAOKA, 1978

Sn

Prosedur analisis perhitungan consolidation S


settlement dengan metode Asaoka dari data S S S -
  n Sn
monitoring. S   S n 1
S - Sn-
1

S0
Estimasi penurunan konsolidasi
final dengan metode Asaoka dari
data monitoring.
S Sn-1
Prosedur Asaoka
 Buat kurva waktu terhadap penurunan berdasarkan data lapangan
yang diperoleh.
 Dari kurva waktu terhadap penurunan dipilih titik penurunan 1,
 2,  3… n sedemikian rupa sehingga pn adalah penurunan pada
waktu tn dan interval waktu adalah konstan ∆t=tn-tn-1
 Plot pembacaan Si dengan Si-1.
 Titik-titik tersebut akan membentuk garis lurus sehingga: Si = So
+ Si-1
 Penurunan akhir, , dinyatakan sebagai: S = So /(1-β), dimana
β adalah gradient garis pada c), lihat Gambar 2.
 Penurunan pada waktu t, t dapat dihitung dengan pendekatan
matematik:
St = S0 + Ae (-t/c)
 Dimana A dan c adalah konstanta dan S0 adalah nilai St pada saat
t = 0. Pendekatan matematik yang lebih kompleks dapat pula
dipergunakan, misalnya: (  t / c1 ) (  t / c2 )
S t  S 0  A1e  A2 e
Prosedur Asaoka
 Konstanta β bisa dipergunakan untuk mendapatkan koefisien
konsolidasi:
TEORI ASAOKA, 1978
SP-8
0

y = A1*exp(-x/t1) + y0
y0 = -1127.71022
Data pengamatan
-200 A1 = 1215.61343
Interpolasi matematik
t1 = 76.45892
Penurunan (mm)

-400

18 Agustus 2009

8 Oktober 2009
-600

-800
3,5 m
mulai
pemompaan
-1000
0 20 40 60 80 100 120 140 160
Waktu (hari)
TEORI ASAOKA, 1978
-1200 SP-8

Estimasi penurunan = 1025 mm


-1000
Penurunan, Si (mm)

-800

-600

Si
=
S i-1
-400

-200

0
0 -200 -400 -600 -800 -1000 -1200
Penurunan, Si-1 (mm)
Koreksi Settlement
Settlement:
1. Elastic/immediate settlement (SE)
2. Consolidation settlement (SC)

3. Secondary settlement (SS)

ST = SE + SC + SS
Penurunan Konsolidasi
Merupakan hasil dari perubahan volume tanah jenuh air sebagai akibat
dari keluarnya air yang menempati pori-pori tanah

Akibat beban luar yang bekerja di


 (beban luar) atas tanah jenuh, tekanan air pori
akan naik mendadak.

Pasir MAT Pada pasir (permeable) air pori


bisa mengalir dengan cepat dan
kenaikan tekanan segera selesai.

Lempung Permeabilitas lempung yang


H
sangat kecil menyebabkan air pori
terjebak dan pelepasan kenaikan
tekanan air pori sangat lambat.
Pasir Keluarnya air pori diiringi
pengurangan volume tanah 
terjadi penurunan
PEMODELAN KONSOLIDASI PRIMER

Akibat pertambahan beban  kenaikan tekanan air pori


Keluarnya air dari pori  tekanan air pori kembali lagi (tanah settle)

kecepatan air

 ditentukan permeabilitas

S

U0 +  pegas U0
(tanah)

air

 0
Seluruh  Seluruh 
dipikul air dipikul Tanah
Consolidation
Settlement:
1. Besarnya?
2. Lamanya?
Proses konsolidasi  disipasi tegangan air pori ekses pada lempung jenuh air
Kompresibilitas
Kompresibilitas

Facts:
Height = 60 m
Girth = 19.6 m
Mass = 14,500 tons
Tilt = 5.5o
Commenced = 1173
Consolidation Test
Oedometer (consolidometer)
Tujuan utama dari test konsolidasi 1 dimensi adalah untuk
mendapatkan parameter kompresibilitas dari suatu tanah
jenuh sebagai besaran untuk menghitung magnitud dan
kecepatan penurunan dari suatu struktur.
Type of Oedometer
(consolidation test apparatus)

 Drainage from the bottom


porous stone may be
measured or otherwise
controlled

 The ring friction is somewhat


less than in a fixed-ring test
Oedometer (consolidometer)

Data yang dibutuhkan:


 Kadar air dan berat sampel di awal dan akhir tes
 Specific gravity, Gs
 Berat kering tanah
 Luas sampel A,
 Ketinggian sampel h, untuk setiap tahapan tes
Consolidation Settlement

Normally, ratio of
diameter to
height of
specimen is
between 2.5 to 5

h
h0

Basic experimental setup of consolidation cell


Consolidation Cell

Preparing the specimen

2 cm-high
6 cm in diameter
Basic experimental setup of consolidation cell
Schematic of an fixed-ring oedometer
EP

Pneumatic
loading

Vertical load
Loading piston
(one unit with the
specimen cap)

LVDT Load
cell
Porous
stone,
loading

LCDPT
Specimen
( = 60mm; h=20mm)

University of Tokyo, Japan


One Dimension Compression Test
Kawabe, et al (2009)

a Test 8: Fujinomori clay 2000


0 e0 = 1.134 Test 8: Fujinomori clay n
w0 = 42.3 % e0 = 1.134

Effective axial stress, 'a (kPa)


LL = 43.6 % w0 = 42.3 %
1500 LL = 43.6 %
PI = 20.0
5 b PI = 20.0 m
l

c 1000 j
d k
Axial strain, a (%)

10
e
f i
g h
500 g
f b-c;f-g;h-i;l-m: 0.05 %/min
15 c
d a-b;g-h;m-n: 0.005 %/min
e
h b c-d;e-f;i-j;k-l: 0.0005 %/min
a d-e;j-k: SL for one day
i 0
j
20 0 5 10 15 20 25 30
k Axial strain, a (%)
l
m

25 b-c;f-g;h-i;l-m: 0.05 %/min Apakah konsep perhitungan 1D


a-b;g-h;m-n: 0.005 %/min
c-d;e-f;i-j;k-l: 0.0005 %/min
n konsolidasi Terzaghi masih berlaku
d-e;j-k: SL for one day pada kasus ini?
30
10 100 1000
Effective axial stress, 'a (kPa)
One Dimension Compression Test
Nawir, et al (2009)

600
Axial effective stress, v (kPa)

500 Test 090708


e0= 3.81
'

air-dried, W 0=0.56%
400
Standard axial strain rate = 0.08%/min

300
embankment
200 adding water

100
creep

0
1000 10000 100000
4.0

3.5

3.0
Void ratio, e

Apakah konsep perhitungan 1D


2.5

2.0 Test 090708


adding water
konsolidasi Terzaghi masih berlaku
1.5
e0= 3.81
air-dried, W 0=0.56%
creep pada kasus ini?
Standard axial strain rate = 0.08%/min
1.0

0.5
1000 10000 100000
Time, s
One Dimension Compression Test
Nawir, et al (2009)
Apakah konsep perhitungan 1D konsolidasi Terzaghi embankment
masih berlaku pada kasus ini?
Test 090623, w0= 0.56%,
w f = 18%,
2.8
e0=2.83
Test 090620, w0 = 0.56%,
w f = 17%,
2.4 e0=3.19
Test 090629, w0 = 0.55%,
w f = 45%,
Void ratio, e

e0=3.47
2.0
Test 090704, w0 = 45.8%,
Saturated specimen w f = 45.8%,
e0=1.59
1.6 Test 090705, w0 = 0.57%,
w f = 0.57%,
e0=3.28

1.2 Test 090708, w0 = 0.56%,


w f = 3.55%,
e0=3.81

0.8

10 100 1000
Axial stress, kPa
One Dimension Compression Test
Nawir, et al (2009)
embankment

40 Test 090729 Pengaruh waktu


Test 090801
35
(kecepatan)
penjenuhan
13.1% difference = 1.75%
Vertical strain, v (%)

30

25

Rate of wetting: 6cc/1980 minutes


20

15 Rate of wetting: 6cc/1.5 minutes

10
Initial axial strain rate
-5
= 1.7 x 10 /s
5

0
4 5 5 5 5 5 5 5 5
0.0 5.0x10 1.0x10 1.5x10 2.0x10 2.5x10 3.0x10 3.5x10 4.0x10 4.5x10
Elapsed time, s
Penurunan Konsolidasi

Tahapan penurunan:
Penurunan Konsolidasi

Tahapan penurunan:

Tahap I : Pemampatan awal (initial compression), yang pada umumnya


adalah disebabkan oleh pembebanan awal (preloading).

Tahap II: Konsolidasi primer (primary consolidation), yaitu periode selama


tekanan air pori secara lambat laun dipindahkan ke dalam
tegangan efektif, sebagai akibat dari keluarnya air dari pori-pori
tanah.

Tahap III: Konsolidasi sekunder (secondary consolidation), yang terjadi


setelah tekanan air pori hilang seluruhnya. Pemampatan yang
terjadi di sini adalah disebabkan oleh penyesuaian yang bersifat
plastis dari butir-butir tanah.
Penurunan Konsolidasi
Transfer  : variasi tegangan total, tegangan air pori,
dan tegangan efektif

 (beban luar)

Pasir MAT

H Lempung

Pasir
Penurunan Konsolidasi
Transfer  : variasi tegangan total, tegangan air pori,
dan tegangan efektif

Pada saat t = 0

Pertambahan Pertambahan Pertambahan


tegangan total tegangan air pori tegangan efektif

 u= ’ = 0

Kedalaman Kedalaman Kedalaman


Penurunan Konsolidasi
Transfer  : variasi tegangan total, tegangan air pori,
dan tegangan efektif

Pada saat 0 < t < 

Pertambahan Pertambahan Pertambahan


tegangan total tegangan air pori tegangan efektif

H ’>0
u<

  

Kedalaman Kedalaman Kedalaman


Penurunan Konsolidasi
Transfer  : variasi tegangan total, tegangan air pori,
dan tegangan efektif

Pada saat t = 

Pertambahan Pertambahan Pertambahan


tegangan total tegangan air pori tegangan efektif

 u=0 ’ = 

Kedalaman Kedalaman Kedalaman


Penurunan Konsolidasi

Model Reologi

0

 pegas   s  k
d
Pegas: k
Dashpot: 
 0  k  
(tanah)
(air) d dt
 dashpot   d  
dt

Jika 0 konstan diberikan pada saat t = 0, solusi persamaan diferensial di atas menjadi:

0
 (1  e ( k /  )t )   0e ( k /  )t
k
Penurunan Konsolidasi

Model Reologi

0
 (1  e ( k /  )t )   0e ( k /  )t
k

0
Apabila 0 = 0    (1  e ( k /  )t )
k
0
t  e ( k /  )t
0 dan 
k

Beban yang diterima oleh pegas:  s  k   0 (1  e ( k / )t )

Beban yang diterima oleh dashpot:  d   0   s   0   0 (1  e ( k / )t )   0e ( k / )t


Penurunan Konsolidasi

Hubungan Perilaku Pegas dan Dashpot dalam Model Reologi

+
KOMPOSISI TANAH

HUBUNGAN BERAT-VOLUME:

Vv
Angka Pori: e=
Vs
Vv
Udara Va Porositas: n=
V
Vv pori
Vw
Vw
Derajat Kejenuhan: S=
Ww Air Vv

W Ww
Kadar Air: w=
V Ws
Ws Butiran
Padat Vs W
Berat Volume: =
V
Berat Volume Kering: W
d  s
V
Penurunan Konsolidasi

Analogi Konsolidasi Pada Tanah Jenuh


PEMODELAN KONSOLIDASI PRIMER

Akibat pertambahan beban  kenaikan tekanan air pori


Keluarnya air dari pori  tekanan air pori kembali lagi (tanah settle)

kecepatan air

 ditentukan permeabilitas

S

U0 +  pegas U0
(tanah)

air

 0
Seluruh  Seluruh 
dipikul air dipikul Tanah
Penurunan Konsolidasi

Uji Konsolidasi 1-D di Laboratorium

PRINSIP PENGUJIAN:
1. Benda uji diameter 2.5” dan tinggi 1”
SKALA direndam
UKUR BEBAN
2. Pembebanan dilakukan bertahap &
tiap tahap selama 24 jam
3. Setelah 24 jam beban dinaikkan 2 kali
lipat
BENDA
UJI 4. Penurunan akibat tiap tahap
pembebanan dicatat
5. Akhir pengujian berat kering benda uji
ditimbang
6. Perubahan angka pori thd tahap
beban diplot (kurva e vs. log p)
Penurunan Konsolidasi

Kurva e vs. log p

Langkah Pembuatan Grafik:


Ws e
1. H s  tinggi butiran padat
AG s  w
e0
2. Hv = H - Hs tinggi awal ruang pori
e1
V H A H e2
3. e 0  v  v  v angka pori awal
Vs H s A H s
H1
4. e1   e1 = e0 - e1
Hs
H1  e2 = e1 - e2
5. e 2 
Hs

log p
p1 p2

Contoh 7.1
Sifat Kompresibilitas Tanah
(ditunjukkan oleh kurva hubungan e dan log p)

Sangat ditentukan oleh:

 Apakah tanah lempung tersebut merupakan tanah


Normally consolidated (NC) atau tanah Over
Consolidated (OC), ditinjau dari sejarah pembebanannya
 Sensitivitas tanah
Tegangan Prakonsolidasi

Untuk mengetahui apakah tanah yang ditinjau termasuk


tanah NC atau OC, perlu terlebih dahulu diketahui tegangan
maksimum pra-konsolidasinya.

Cara menentukan tegangan maksimum pra-konsolidasi:

 Test langsung di lapangan


 Metode grafis berdasarkan hasil tes konsolidasi
 Dengan perhitungan
Tegangan Prakonsolidasi
Metode grafis yang paling banyak dipergunakan adalah metode
yang diperkenalkan oleh A. Casagrande (1936):

pc
Penurunan Konsolidasi
Terkonsolidasi Secara Normal (Normally Consolidated) dan
Terlalu Terkonsolidasi (Over consolidated) pada Lempung

Penentuan Tekanan Prakonsolidasi (pc):


1. Dengan melakukan pengamatan secara
visual, tentukan titik a di mana grafik e vs.
log p mempunyai jari-jari kelengkungan
yang paling minimum.
2. Gambar garis horisontal ab.
3. Gambar garis singgung ac pada titik a.
4. Gambar garis ad yang merupakan garis
bagi sudut bac.
5. Perpanjang bagian grafik e versus log p
yang merupakan garis lurus hingga
memotong garis ad di titik f.
Absis titik f adalah besarnya tekanan
prakonsolidasi
Penurunan Konsolidasi
Terkonsolidasi Secara Normal (Normally Consolidated) dan
Terlalu Terkonsolidasi (Over consolidated) pada Lempung

e0 Kemiringan kurva pada awal


e1 pemampatan terlihat landai adalah
e2 akibat sampel yang mengembang saat
diambil (terlepas dari tekanan
overburden) dan kemudian mendapat
tekanan lagi.

Apabila sampel terus diberi tekanan


sampai lebih besar dari tekanan
overburden, maka perubahan angka
pori akan lebih besar, sehingga kurva e
log p
vs. log p menjadi linear dan memiliki
p1 p2 kemiringan yang lebih tajam.
Penurunan Konsolidasi
Terkonsolidasi Secara Normal (Normally Consolidated) dan
Terlalu Terkonsolidasi (Over consolidated) pada Lempung

e
1. Normally Consolidated (NC):
apabila tekanan overburden yang
diterima oleh tanah saat ini
merupakan tekanan maksimum
yang pernah dialami oleh tanah
tersebut

2. Over Consolidated (OC): apabila


tekanan overburden yang diterima
oleh tanah saat ini lebih kecil dari
tekanan maksimum yang pernah
log p
dialami oleh tanah tersebut
(tekanan prakonsolidasi)
Penurunan Konsolidasi
Terkonsolidasi Secara Normal (Normally Consolidated) dan
Terlalu Terkonsolidasi (Over consolidated) pada Lempung

Over Consolidation Ratio (OCR):

pc
OCR 
p

pc : tekanan prakonsolidasi
p : tekanan efektif overburden saat tanah diuji
log 


NC OC OC NC

0 = h 1 = 0+110 lt 2 = 0+3 lt 3 = 0 + 110 lt 4 = 0 + 150 lt


Log 

4 = 0 + 150 lantai 4
1 = ’h + 110 lantai 1
3
2 = ’h + 3 lantai 2
0 = ’ h 0

Normally Consolidated (NC):
 max yg pernah terjadi =  sekarang

Overconsolidated (OC)
 max yg pernah terjadi >  sekarang

OCR (Overconsolidation Ratio) =  max yg pernah terjadi


 sekarang

1 = ’h+30 lantai
= 2 = ’h+3 lantai
Consolidation Test Curve

Cc Cr


Penurunan Konsolidasi

Perhitungan Penurunan Konsolidasi Primer

V = V0 - V1 = H . A - (H - S) - A = S . A (1) Dari persamaan (1), (2), (3), (4) :


V = S . A =Vv0 - Vv1 = Vv AH
(2) V  S.A  e.Vs  e
V v 1  e0
e   Vv = e . Vs (3)
Vs e
SH
V
Vs  0 
AH
(4) 1  e0
1  e0 1  e0
Persamaan Umum Konsolidasi
Penurunan Konsolidasi

Perhitungan Penurunan Konsolidasi Primer

Lempung Terkonsolidasi Secara Normal (NC)

e
Index pemampatan Cc:

e p  p 
Cc   e  Cc log 0
 p 0  p   p 0 
log 
 p0 
e
e
Cc SH
1  e0

p  p
Cc. log 0
p0
SH
1  e0
log p

log (p0+p)-log p0
Penurunan Konsolidasi

Perhitungan Penurunan Konsolidasi Primer

Lempung Terlalu Terkonsolidasi (OC):

e p0+p  pc  absis pada garis ab

e = Cs (log (p0+p)-log
p0)
a
Cs p 0  p
b Cs.log
p0
SH
1  e0
Cs
Cc

p0+p > pc  absis pada garis bc


c
pc p c  p
Cs.log Cc.log
p0 pc
SH H
log p 1  e0 1  e0
p0 pc
Penurunan Konsolidasi

Perhitungan Penurunan Konsolidasi Sekunder

e t2
C  . log
e e t t1
C  Ss  H  H.C  '.log 2  H
t2 1  ep t1 1  ep
log
t1
Perhitungan konsolidasi sekunder sangat penting
C untuk semua jenis tanah organik atau anorganik
C '  yang sangat mampu mampat.
1  ep
ep Pada tanah anorganik yang terlalu terkonsolidasi
e (OC) index pemampatan sekunder sangat kecil,
hingga penurunan sekunder dapat diabaikan
log t
t1 t2
Penurunan Konsolidasi

Harga Empiris Index Pemampatan (Cc):

Umumnya Cc ditentukan dari kurva hubungan antara angka pori dengan logaritma tekanan
hasil dari uji konsolidasi di laboratorium.

Terzaghi dan Peck (1967): Cc = 0,009 (LL – 10)  lempung undisturbed

Cc = 0,007 (LL – 10)  lempung remolded

Hasil Penelitian Lain:


Persamaan Acuan Pemakaian
Cc = 0,007 (LL-7) Skempton lempung remolded
Cc = 1,15 (e0 – 0,27) Nishida semua lempung
Cc = 0,30 (e0 – 0,27) Hough tanah kohesif anorganik: lanau, lempung berlanau, lempung
Cc = 0,0115 wN tanah organik, gambut, lanau organik, lempung
Cc = 0,75 (e0 – 0,5) tanah dengan plastisitas rendah
Cc = 0,156 e0 + 0,0107 lempung

Index Pemuaian (Cs): 1 1


Cs  ( sampai )Cc
5 10

Contoh 7.2, 7.3, 7.4


p?
1. Diasumsikan beban pondasi menyebar secara linier

top
middle
bottom
Cara lain mencari :
Transfer beban diitengah-tengah
lapisan


q q

B
L
Z

 
=qI


Tampak atas posisi titik tinjauan
terhadap daerah pembebanan
Tegangan pada kedalaman 4.5 m
Lama Konsolidasi?
Po+p

d eo
Hd
e
clay
k e
Cv 
 w mv
p
av e
mv  av 
1  eo p po p

mv = coefficient of volume compressibility


av = coefficient of compressibility ; k = coefficient of permeability
Cv = coefficient of consolidation
Square Root Method

0.848d 2
cv =
t 90
Log Fitting Method
0.197 d 2
cv =
t50
Lama Konsolidasi?
Tergantung dari
besarnya derajat
d konsolidasi U%

Untuk U% antara 0 dan 53%:

 U % 
2

T  
4  100 

Untuk U% > 53%:


T  1.781  0.933 log 10 (100  U %)
Kecepatan Konsolidasi
(Time rate of consolidation)

Kecepatan Konsolidasi (Terzaghi):

Asumsi yang digunakan:


1. Sistem lempung dan air bersifat homogen
2. Lempung jenuh sempurna (S = 100%)
3. Pemampatan air diabaikan (jika ditekan volume tidak berubah)
4. Pemampatan butiran tanah diabaikan
5. Aliran air hanya satu arah saja (arah pemampatan)
6. Hukum Darcy berlaku, v = k . i
Kecepatan Konsolidasi
(Time rate of consolidation) Kecepatan Konsolidasi (Terzaghi, 1925):

 v z 
 vz  dz dx dy
  z 
z p
u
h
w

dz

Pasir

A
2Hdx
Lempung
z dy

dx
vz dx dy

rate of outflow of water – rate of inflow of water = rate of volume change

 v  V
 v z  z dz dx dy  v z dx dy 
 z  t
Kecepatan Konsolidasi
(Time rate of consolidation) Kecepatan Konsolidasi (Terzaghi, 1925):

rate of outflow of water – rate of inflow of water = rate of volume change

 v  V V = volume of the soil element


 v z  z dz dx dy  v z dx dy 
 z  t v z = velocity of flow in z direction
Exercises:

1. A stratum of normally consolidated clay of 7m thick is located at


a depth 12 m below ground level. The natural moisture content
of the clay is 43 per cent and its liquid limit is 48 per cent. The
specific gravity of the solid particles is 2.76. The water table is
located at a depth 5 m below ground surface. The soil is sand
above the clay stratum. The submerged unit weight of sand is
1.1 tones per m3 and the same weighs 1.8 tonnes/m3 (18
kN/m3) above water table. The average increase in pressure at
the centre of the clay stratum is 12 tones per m2 due to the
weight of a building that will be constructed on the sand above
the clay stratum. Estimate the expected settlement of the
structure.
Exercises:

5m h3 3

e Ww
7m h2 2
1+e W

h1 1
1 Ws 7m
Soal:

2. Soil investigation at a site gave the following information. Top


soil up to a depth of 10.6m is fine sand, and below this lies soft
clay layer of 7.60m thick. The water table is at 4.60m below the
ground surface. The submerged unit weight of sand b is 10.4
kN/m3, and wet unit weight above water table is 17.6 kN/m3.
The water content of the normally consolidated clay, wn = 40%
its liquid limit, wl=45%, and specific gravity of the solid particles
is 2.78. The proposed construction will transmit a net stress of
120 kN/m2. Find the average settlement of the clay layer.
Soal:

3. A strata of normally consolidated clay of thickness 3 m is drained


on both sides. It has a coefficient of permeability k = 5 x 10-8
cm/sec. and a coefficient of volume compressibility mv= 125 x
10-4 cm2/kg. Determine the ultimate value of the compression of
the strata by assuming a uniformly distribute load of 25 T/m2
and also determine the time required for 20 per cent and 80 per
cent consolidation.

You might also like