Superviser from UiTM : Dr.

Thevaneyan a/l Krishta


Superviser from JPW : Ir. Mohd Nasharuddin
Date : 16 August 2018
Time : 9:30 am
 Jurutera Perunding Warisan (JPW) is a Civil and
Structure Engineering consultant firm
 Owned by Ir. Mior Muhammad Bin
Shamsuddin
 Partnership with Professional Electrical
Engineer, Ir. Mohammad Zaiyan Bin Saidin
and Professional Mechanical Engineer, Ir. Dr.
Shuib bin Sahudin
 Register as Civil, Mechanical and Electrical
Engineering with BEM.
 Services company offer :
1. Preparation of Detailed Engineering
Drawings
2. Preparation of Tender Documents and
Specifications
3. Contract Administration
4. Road Safety Audit (RSA)
5. Traffic Impact Assessment (TIA)
Many more...
 Provide engineering experience exposure
 Enhancing interpersonal and professional
development skill
 Relating existing knowledge to an
engineering project
 Encouraging solve problem and creative
thinking skills
 Week 1
- Record defect in dilapidation report
- Fold plan
- Exposure to Road safety Audit

 Week 2
- Meeting on RSA with Local Authorities at
Kuala Nerang
- Collect data for RSA report at Nilai, Senawang
and Kuala Langat
 Week 3
• Discussion and meeting on RSA stage 1,2 and
3 on bridge construction at JKR Kuala Lumpur
• Site visit project on high rise building at Fair
Park

 Week 4
- Preparation report on RSA
 Week 5
- Collect and record data on defects at 1 storey
house in dilapidation report
 Stage 1 Audit: Identify safety problems
associated with the overall concept for a:
1. Project
2. Road network safety implications
3. Route options
4. Intersections
5. Interchange types
 Stage 2 Draft (Preliminary) Design Stage
1. Many of the engineering features of a
projects are established
2. Any requirement are finalised and if not
adequate it may record in unsatisfactory
design features
Stage 3 detail design stage
1. RSA test design decision and identify
potential hazard resulting from adverse
combination
Eg: vertical and horizontal alignment

2. Designer continue making balances


selection and application of standards and
guides to meet the specific condition
 Stage 4 the pre-opening stage
1. involves site inspection of a project by day
and at night or prior to its practical
completion or prior to opening new project
to traffic
 Stage 5 RSA of an existing road
1. Identify safety problems which develop due
to normal ‘wear and tear’ from traffic
operation
 Location of Sungai Raia View of Sungai Raia Bridge
Bridge
At Jalan Gopeng, direction from
Gopeng to Simpang Pulai at the At Jalan Gopeng, direction from
proposed bridge Gopeng to Simpang Pulai before the
proposed bridge
At Jalan Gopeng, direction from At Jalan Gopeng, direction from
Simpang Pulai to Gopeng shown Simpang Pulai to Gopeng before the
motorcycle lane has been use for route proposed bridge
lane Simpang Pulai - Gopeng
BRC for shear wall

Mould for shear wall

Defect on shear wall ( Honey comb)

Shear wall after concreting


Crack on wall Plaster ceiling damage