Describe C300 and Series C I/O Configuration

C300 Configuration 1 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Introduction Honeywell
• In this lesson you will learn to configure C300 Controller and
Series C I/O
• PMIO configuration is discussed in a separate lesson
• The steps for configuration are similar to the C200 configuration with
some differences:
– Add a new Control Processor Module to the Project hierarchy
• Control Builder adds the CEE and two IOLINK modules
– Configure the Controller
– Configure the CEE
– Configure the IOLINKs (PMIO or Series C IO)
– Configure the IOMs
– Assign the IOMs to the IOLINKs
– Load the Controller, CEE, IOLINKS, and the IOPs
– Activate the CEE

C300 Configuration 2 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Topics Honeywell

• Configuring the C300 and CEE


• Configuring IOLINKs
• Configuring IOMs
• Loading the C300, IOLINKs, and IOMs
• Activating the C300

C300 Configuration 3 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring a Controller Honeywell

Follow these steps to add a new


controller from the pull-down menus

C300 Configuration 4 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring a Controller – Main Tab Honeywell

Data entry
details will be Item name
provided in the
lab exercise

Device index Number of C300 Check for redundant controller

C300 Configuration 5 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring a Controller – Server History Tab Honeywell

History parameters and control level required to operate this C300

C300 Configuration 6 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring a Controller – Group and Trend Assignment Honeywell

Point, group, trend and


associated displays
(residing on the server)
are defined on the Server
Displays tab

Select OK to close and


save the new controller

C300 Configuration 7 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
C300 View in Control Builder Honeywell

C300, CEE, and


IOLINKs

Redundancy

C300 Configuration 8 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring a CEE Honeywell

Data entry details


will be provided in
the Lab exercise

C300 Configuration 9 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Question 1: C300 Configuration Honeywell
Which of the following statements is not true for C300 configuration?
A) Device Index number specified on the C300
IOTA needs to be specified
B) 2 IOLINKs are automatically created
C) Only one IOLINK is automatically created for
Series C I/O
D) 5ms Base Execution Period is supported for
non-redundant C300 configuration

The
Yourcorrect
answer: answer is:
Incorrect.
You mustThe falsethe
answer statement
questionisbefore
"Only one
YouIncorrect
did You
Correct!
IOLINK not
Correct
is - Click
answer
answered anywhere
thisthis
-automatically
When Click anywhere
acontinuing
C300 to
question continue
correctly!
completely
to continue
controller
created for
is created
Series Cin
Control
I/O".
I/O".When
When
Builderaa C300
C300
2 IOLINKS
controller
controller
are is
automatically
is created
created in
in
Control Builder 2 IOLINKS
added. are automatically
added.
Click anywhere to continue.
Click anywhere to continue.
Submit Clear

C300 Configuration 10 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Topics Honeywell

• Configuring the C300 and CEE

• Configuring IOLINKs
• Configuring IOMs

• Loading the C300, IOLINKs, and IOMs

• Activating the C300

C300 Configuration 11 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
IOLINK Configuration – Link 1 Honeywell

I/O family selection

I/O Link number 1 Cable - Gray

C300 Configuration 12 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
IOLINK Configuration – Link 2 Honeywell

I/O Link number 2 Cable - Violet

C300 Configuration 13 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring C300 Hardware Honeywell

• The Control Processor Module (CPM) and its Control Execution


Environment (CEE) are now configured but not yet downloaded

C300 Configuration 14 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Question 2: IOLINK Configuration Honeywell
Which of the following items are specified during IOLINK configuration?

A) Series C or PM IO, one type on each IOLINK


B) Series A I/O type
C) Whether Series C and PM IO is to be used on
the same IOLINK

The correct
Your answer: answer is:
Correct!
Incorrect. When
When configuring
You must answerconfiguring an
anIOLINK
the questionIOLINK only
onlyone
before one
YouIncorrect
Correct
did You
not -
answer
answered
-Click
Click
type of IO family anywhere
anywhere
thisthis
question
correctly!
to
tocontinue
continue
completely
can be connected to each
continuing
IOLINK i.e. Series C or PM IO, one type on each
link.

Click anywhere to continue.

Submit Clear

C300 Configuration 15 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Topics Honeywell

• Configuring the C300 and CEE

• Configuring IOLINKs

• Configuring IOMs
• Loading the C300, IOLINKs, and IOMs

• Activating the C300

C300 Configuration 16 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring Series_C_IO Honeywell

Menu method

C300 Configuration 17 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring Series_C_IO, contd. Honeywell

1 2

Control Builder
automatically
names the IOM

C300 Configuration 18 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Configuring Series_C_IO, contd. Honeywell

IOM number

C300 Configuration 19 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Assigning Series_C_IO Honeywell

2 1
3

Assigned
to CEE

C300 Configuration 20 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Topics Honeywell

• Configuring the C300 and CEE

• Configuring IOLINKs

• Configuring IOMs

• Loading the C300, IOLINKs, and IOMs


• Activating the C300

C300 Configuration 21 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Loading the Controller, CEE, and IOMs Honeywell

Not yet
loaded

C300 Configuration 22 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Loading the Controller, CEE, and IOMs, contd. Honeywell

Verify that the


items to load
are checked

Note:
You can decide to
have the modules
go to the active
state
automatically by
clicking this
checkbox with the
Post Load State
selected to be
“Active”

C300 Configuration 23 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Question 3: IOP Configuration Honeywell
Assigned I/O modules appear under:

A) Unassigned tree in Project tab


B) IOLINK tree in Project tab
C) Directly under the CEE tree in Project tab

The correct
Your answer:answer is:
Correct! The assigned I/O modules appear
You must
Incorrect
You answer
-Click
Click
answered the question
anywhere to before
continue
Incorrect.
You Correct
did -The
notthe
under answer thisthis
assigned
anywhere
IOLINK correctly!
I/O
question
tree modules
into continueappear
completely
Project tab.
continuing
under the IOLINK tree in Project tab.
Click anywhere to continue.
Click anywhere to continue.

Submit Clear

C300 Configuration 24 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Topics Honeywell

• Configuring the C300 and CEE

• Configuring IOLINKs

• Configuring IOMs

• Loading the C300, IOLINKs, and IOMs

• Activating the C300

C300 Configuration 25 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Activating a Control Strategy Honeywell

Select LASTCOLD

C300 Configuration 26 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Activating a Control Strategy, contd. Honeywell

Click Yes

Blue: The object is not running (inactive)


Green: The object is running (active)
Red: Communication failure

C300 Configuration 27 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Other C300 Configuration Honeywell

• A Control Module is
configured like a
C200 Control
Module, a sample is
shown
• For more detail,
please refer to the
sample lab
procedure

Series C I/O
Channels

C300 Configuration 28 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019
Summary Honeywell

• When you configure and load C300 hardware and I/O in Control Builder,
remember:

– Series C IOM number is set on the IOTA of the corresponding IOM using a
numbered jumper plug

– The device index of C300 can be found on the rotary switches located in front of
the C300 board

– Before loading the C300 controller, its Control Execution Environment (CEE) and
IOLINKs:

• Configure the Controller, its CEE, and IOLINKs

• Define the I/O Family type on each IOLINK

• Assign the IOMs to the respective IOLINKs

– Activate the C300 from the CEE


C300 Configuration 29 EXP20R300 - EPKS CEE C200/C300/ACE
Describe C300 and Series C I/O Configuration 1/28/2019
Conclusion Honeywell

Describe C300 and Series C I/O Configuration

Completion
Certificate

Proceed to the next lesson in your course material

C300 Configuration 30 EXP20R300 - EPKS CEE C200/C300/ACE


Describe C300 and Series C I/O Configuration 1/28/2019

You might also like