1. Quarry process
2. Unit operation of mining
3. CMIC concession and Topography
A. Mineable reserve estimation at East and Middle Area
4. Lithology of eastern and crusher area
5. Quarry planning
6. Blasting design
A. Pattern design
B. Sources of fly-rock and back-break
7. External Raw Material
24/03/2019 2
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
1. Quarry process
24/03/2019 3
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
2. Unit operation of mining
Drilling
Rock Breakage
Blasting
Production
Cycle
Unit
Operation Loading
Auxiliary Material
Operation Handling Haulage
24/03/2019 4
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
2. Unit operation of mining cont.,
Loading
Hauling
24/03/2019 5
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
3. CMIC Concession and Topography
24/03/2019 6
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
A. Mineable Reserve Estimation at Eastern and Middle area
Reserve in East and middle area
60.00
Total = 118.88 MT
50.00 47.63
40.00
34.14 33.49
Million ton
30.00
20.00
10.00
3.62
0.00
Micritic Limestone Semi Marble Cherty Limestone Argillanceous limestone
Type of rock
24/03/2019 7
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
4. Lithology of Eastern and Crusher area
24/03/2019 8
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
5. Quarry planning
• Geotechnical knowledge to
conduct with Rock slope analysis
• Initial exploitation
24/03/2019 9
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
5. Quarry planning
Φ = 5.7 deg
24/03/2019 10
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
6. Blasting Design
2𝑆𝐺𝑒 Spacing 𝑆 = 𝐵
𝐵 = 0.012 × + 1.5 × 𝐷𝑒
𝑆𝐺𝑟 Sub-drill J = 0.3 x B
Stemming T = 0.85 x B
SGe = Specific gravity of explosive
SGr = Specific gravity of rock Rock volume/hole = B x S x H
De = diameter of drill hole
24/03/2019 11
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
A. Pattern Design
Blast hole
Development Blast
24/03/2019 12
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
B. Sources of Fly Rock and Back break
M
a
r
kin
g a
n
d
C
o
l
l
ari
ngE
rr
or
s
I
ncl
i
nati
onand
Di
rec
ti
onal
E r
r
or
s
U
n
der
gau
ge
o
r
lo
st
hol
es
D
e
fl
ect
i
on
L
a
yo
ut E
r
r
ors
P
o
si
t
ion
H
o
l
eDe
p
th
S
o
ur
ce
so
fD
ri
l
li
ngE
r
r
or E
r
r
or
s
• Geological structure
• Blast condition
• Improper charging and firing
24/03/2019 13
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
7. Blasting
Check Current
Cut Emulsion into piece Charging + Measuring
Stemming
ANFO
Emulsion
Electric Gap for blast Initial explosive
De =127mm
24/03/2019 14
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
7. Blasting
After blasted
Back break
24/03/2019 15
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
8. External Raw Material
D = 1m
D ≈ 3m
24/03/2019 16
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
8. External Raw Material
D ≈1m
D ≈1.5 m
24/03/2019 17
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
8. External Raw Material
Bauxite Quarry
Al2O3 ≥ 20%
SiO2 ≤ 30%
Moisture ≤ 15%
24/03/2019 18
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
24/03/2019 19
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
24/03/2019 20
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.