Professional Documents
Culture Documents
ABOUT GAIL
● Gail (India) Limited (GAIL) (formerly known as Gas Authority of
India Limited) is the largest state-owned natural gas processing
and distribution company in India.
● Headquarter is in NEW DELHI.
● GAIL (India) Limited was incorporated in August 1984 as a Central
Public Sector Undertaking (PSU) under the Ministry of Petroleum
& Natural Gas (MoP&NG).
● GAIL was conferred with the MAHARATNA status on 1 Feb 2013,
by the Government of India.
● It has the following business segments: natural gas, liquid
hydrocarbon,liquefied petroleum gas transmission,petrochemical ,
city gas distribution, exploration and production, GAILTEL and
electricity generation.
GAIL (INDIA) LIMITED LOGO
GAIL PIPELINE DETAILS
FIRST GAIL CONSTRUCTION AND OPERATION
• The site was located at near Sumanahalli, pipeline road, laggere, prem
Nagar, beggars Colony, Sunkadakatte, Bengaluru.
• The WAREHOUSE was constructed in the area available at the CNG
GAS STATION.
• The total area of the site was 824.7 Sq-m.
• The estimated contract value including all taxes was around 3 crore.
• M25 grade concrete was used from the CHOWDWSHWARI
CONCRETE SOLUTIONS.
• Steel bars of Fe 500 was used from KAMADENU STEELS.
.
CNG GAS STATION (SV2B)
• This is a control station where the pressurised gas reaches this station
through the Dabhol-Bangalore pipeline.
• It also works as CNG refilling fuel station.
• Gas from this part is tramsmitted to variou parts of bangalore.
ADVANTAGES OF CNG -
• CNG has lower cost of production .
• It is used as fuel in place of gasoline,diesel fuel and LPG.
• Less pollution and more efficient.
WAREHOUSE DETAILS
DETAILS OF FOOTING ,COLUMN,BEAM.
● FOOTING – SIZE(LXBXD) m COLUMN-SIZE(BXD) m BEAM-SIZE(BXD) m
F2 - 2.6X3.6X.6 C6 – 0.45X0.45
F3 - 4.5X4.5X1.05
F3 - 3.6X6X1.6
FOOTING AND COLUMN DETAILS
View of the site at the begging of the Internship
BAR CHART FOR CONSTRUCTION OF WAREHOUSE
LEARING AT SITE
FOOTI FOOT
NG ING PCC PCC
DESCRIP NUMB LENGT BREADT HEIGHT(m VOLUM
SL FOOTIN NUM SIZE(m DEPT SIZE( DEPTH VOLUM
SL NO TION ER H(m) H(m) ) E(m3)
NO G TYPE BER ) H(m) m) (m) E(m3)
3.4X3. 1 C1 11 0.6 0.6 6 23.76
1 F1 7 3.2X3.2 0.6 4 0.075 49.077 2 C2 6 0.6 0.23 6 4.968
2 F1A 1 3.8X3.8 0.8 4X4 0.075 12.752
3 C4 4 0.75 0.75 6 13.5
3.2X5.
3 F1B 3 3X5 1 2 0.075 48.774 4 C6 1 0.45 0.45 6 1.215
2.8X3. 5 C1 9 0.6 0.6 3 9.72
4 F2 9 2.6X3.6 0.6 4 0.075 51.354
6 C2 1 0.6 0.21 3 0.414
4.7X4.
5 F3 9 4.5X4.5 1.05 7 0.075 206.273 7 C6 1 0.45 0.45 3 0.6075
3.7X6.
TOTAL
6 F3A 4 3.5X6 1.2 2 0.075 107.682
VOLUME 54.1845
TOTAL
VOLU
ME 475.912
Estimation of Beams:-
DESCRIPTION
SL NO BEAM LENGTH(m) BREADTH(m) HEIGHT(m) VOLUME(m3)
1 0.6X0.75 m 342.3 0.6 0.75 154
2 0.23X0.6 m 83.45 0.23 0.6 11.622
TOTAL VOLUME 165.622
● Improper compaction of the soil which led to the settlement of the soil.
The remedial measure taken- The setteled portion of the land was filled by PCC.
● Improper joints where the beam was not placed on the column at a particular point.