INTRODUCTION

ABOUT GAIL
● Gail (India) Limited (GAIL) (formerly known as Gas Authority of
India Limited) is the largest state-owned natural gas processing
and distribution company in India.
● Headquarter is in NEW DELHI.
● GAIL (India) Limited was incorporated in August 1984 as a Central
Public Sector Undertaking (PSU) under the Ministry of Petroleum
& Natural Gas (MoP&NG).
● GAIL was conferred with the MAHARATNA status on 1 Feb 2013,
by the Government of India.
● It has the following business segments: natural gas, liquid
hydrocarbon,liquefied petroleum gas transmission,petrochemical ,
city gas distribution, exploration and production, GAILTEL and
electricity generation.
GAIL (INDIA) LIMITED LOGO
GAIL PIPELINE DETAILS
FIRST GAIL CONSTRUCTION AND OPERATION

● Hazira – Vijaypur – Jagdishpur (HVJ) pipeline project. It was one


of the largest cross-country natural gas pipeline projects in the
world.
● This 1750-kilometre-long pipeline was built at a cost of ₹17 billion
(US$240 million) and it laid the foundation for development of
market for natural gas in India.
● GAIL commissioned the 1,750 kilometres (1,090 mi) Hazira-
Vijaipur-Jagdishpur (HVJ) pipeline in 1991. Between 1991 and
1993, three liquefied petroleum gas (LPG) plants were constructed
and some regional pipelines acquired, enabling GAIL to begin its
gas transportation in various parts of India.
S. no. Pipeline Length km/ capacity in MMSCMD Commissioning

1. Dadri Bawana Nangal* 610 km/31 MMSCMD 2011–12

2 Chainsa Jhajjar Hissar** 300 km/35 MMSCMD 2011–12

3. Dabhol Bangalore 1386 km/ 16 MMSCMD 2013–14

4. Kochi Kanjirikkod Bangalore 860 km / 16 MMSCMD 2012–13

5. Jagdishpur-Haldia Bokaro-Dhamra 2500 / Unknown 2019-20


ROUTE MAP OF BANGALURU CITY LINE AND LMC
SITE DETAIL AND MATERIALS USED

• The site was located at near Sumanahalli, pipeline road, laggere, prem
Nagar, beggars Colony, Sunkadakatte, Bengaluru.
• The WAREHOUSE was constructed in the area available at the CNG
GAS STATION.
• The total area of the site was 824.7 Sq-m.
• The estimated contract value including all taxes was around 3 crore.
• M25 grade concrete was used from the CHOWDWSHWARI
CONCRETE SOLUTIONS.
• Steel bars of Fe 500 was used from KAMADENU STEELS.

.
CNG GAS STATION (SV2B)
• This is a control station where the pressurised gas reaches this station
through the Dabhol-Bangalore pipeline.
• It also works as CNG refilling fuel station.
• Gas from this part is tramsmitted to variou parts of bangalore.
ADVANTAGES OF CNG -
• CNG has lower cost of production .
• It is used as fuel in place of gasoline,diesel fuel and LPG.
• Less pollution and more efficient.
WAREHOUSE DETAILS
DETAILS OF FOOTING ,COLUMN,BEAM.
● FOOTING – SIZE(LXBXD) m COLUMN-SIZE(BXD) m BEAM-SIZE(BXD) m

F1 - 3.2X3.2X.6 C1&C3 - 0.6X0.6 B1 -0.6X0.75

F1A - 3.8X3.8X.8 C2 – 0.23X0.6 B2- 0.6X0.23

F1B - 3X5X1 C4&C5 - 0.75X0.75

F2 - 2.6X3.6X.6 C6 – 0.45X0.45

F3 - 4.5X4.5X1.05

F3 - 3.6X6X1.6
FOOTING AND COLUMN DETAILS
View of the site at the begging of the Internship
BAR CHART FOR CONSTRUCTION OF WAREHOUSE
LEARING AT SITE

• Working out the total area of the construction site.


• Safety standards -Work permit system.
• Concrete estimation.
• Shuttering area calculation.
Estimation of Footing
● Estimation of concrete for footing,column,beam slab,plinth beam.

FOOTI FOOT
NG ING PCC PCC
DESCRIP NUMB LENGT BREADT HEIGHT(m VOLUM
SL FOOTIN NUM SIZE(m DEPT SIZE( DEPTH VOLUM
SL NO TION ER H(m) H(m) ) E(m3)
NO G TYPE BER ) H(m) m) (m) E(m3)
3.4X3. 1 C1 11 0.6 0.6 6 23.76
1 F1 7 3.2X3.2 0.6 4 0.075 49.077 2 C2 6 0.6 0.23 6 4.968
2 F1A 1 3.8X3.8 0.8 4X4 0.075 12.752
3 C4 4 0.75 0.75 6 13.5
3.2X5.
3 F1B 3 3X5 1 2 0.075 48.774 4 C6 1 0.45 0.45 6 1.215
2.8X3. 5 C1 9 0.6 0.6 3 9.72
4 F2 9 2.6X3.6 0.6 4 0.075 51.354
6 C2 1 0.6 0.21 3 0.414
4.7X4.
5 F3 9 4.5X4.5 1.05 7 0.075 206.273 7 C6 1 0.45 0.45 3 0.6075
3.7X6.
TOTAL
6 F3A 4 3.5X6 1.2 2 0.075 107.682
VOLUME 54.1845
TOTAL
VOLU
ME 475.912
Estimation of Beams:-

DESCRIPTION
SL NO BEAM LENGTH(m) BREADTH(m) HEIGHT(m) VOLUME(m3)
1 0.6X0.75 m 342.3 0.6 0.75 154
2 0.23X0.6 m 83.45 0.23 0.6 11.622
TOTAL VOLUME 165.622

Estimation of Plinth Beams: -


Estimation of Plinth Beams: -

DESCRI NUM LENGT BREADT HEIGHT( VOLUME


SL NO PTION BER H(m) H(m) m) (m3)
PLINTH
1 BEAM 6 73.205 0.23 0.6 10.102
PLINTH
2 BEAM 4 16.915 0.25 0.45 1.903
PLINTH
3 BEAM 2 35.85 0.3 0.6 6.453
TOTAL
VOLUME 18.458
SUMMARY OF THE CONSTRUCTION WORK

● Total quantity of concrete required for footing = 475.912 m3


● Total quantity of concrete required for column = 54.1845 m3
● Total quantity of concrete required for plinth beam =18.458 m3
● Total quantity of concrete required for beams =165.622 m3
CENTERING AND SHUTTERING

CENTERING AND SHUTTERING FOR BEAMS


BAR BENDING AT THE SITE
SHUTTERING FOR BEAMS AND SLAB
STELL PLACING

STEEL PLACING FOR BEAMS


STEEL PLACING FOR STAIRCASE AT ENTRENCE TWO WAY SLAB
INTERNSHIP EXPERIENCE
● Understanding the details of building drawing and planning.
● Execution of the drawings into proper work.
● Roles and responsibilities of the Site Engineer.
● Role of Site Engineer in managing man power.
● Duties of the Main Engineer and the sub-ordinate Engineer .
● Improvisation in the steel reinforcement detailing by the Site Engineer at the
site with respect to the drawings.
● Technical details about GAIL gas station, working and distribution methods.
● Importance of safety at the site and specific methods used for the safety purpose.
PROBLEMS ENCOUNTERED AT SITE AN
ITS REMIDIES

● Improper compaction of the soil which led to the settlement of the soil.

The remedial measure taken- The setteled portion of the land was filled by PCC.

● Improper joints where the beam was not placed on the column at a particular point.