Feasibility Study

Trouble Shooting & Revamp

Process Design / Basic Engg.

Plant Design Cycle


Stable Operation & Performance Testing

FEED

Pre-Commissioning & Commissioning

Detail Engg.

Mid & Downstream Business Training Module


Feasibility Study:
     Conceptualization Process Simulation Development of Process Flow Scheme Cost Estimation Techno-Commercial Evaluation

Basic Engineering:
    Mass and Energy Balance Process Control Scheme PFDs and Basic Process P&IDs Sizing and Basic Spec. for Equipments and Instruments

Mid & Downstream Business Training Module


Front End Engineering Design (FEED):
     BEP to Project Specific Package (Residual Engineering) Verification of Process data for Critical items Preparation of Specifications Identification of Scope Splits Identification of applicable Codes & Standards

Commissioning:
    Pre-Commissioning Commissioning Startup and Feed charging Performance Guarantee test run

Mid & Downstream Business Training Module

Mid & Downstream Business Training Module


WORK FLOW DIAGRAM
REVIEW & COMMENTS EQUIPMENT LIST UHD REVISED P&ID LINE LIST PROCESS D/S FOR EQUIPMENTS EQUIPMENT LIST EQUIPMENT LIST UHD REVISED P&ID HAZARDOUS SOURCE LIST REVIEW & COMMENTS VENDOR DOCUMENTS

PLOT PLAN

PP

TQ EQ. LIST UHD UTILITY SUMMARY FLARE LOAD SUMMARY CHEMICAL SUMMARY HAZARDOUS SOURCE LIST REVISED P&ID BDEP LINE LIST PROCESS D/S FOR EQUIPMENTS UPDATED D/S FOR EQUIPMENTS UPDATED D/S FOR INSTRUMENTS PRECOMMISIONING MANUAL OPERATING MANUAL

TQ EQ. LIST UHD UTILITY SUMMARY FLARE LOAD SUMMARY CHEMICAL SUMMARY HAZARDOUS SOURCE LIST REVISED P&ID

CV EL

PE

BDEP LINE LIST PROCESS D/S FOR EQUIPMENTS UPDATED D/S FOR EQUIPMENTS UPDATED D/S FOR INSTRUMENTS PRECOMMISIONING MANUAL OPERATING MANUAL

PC

EQUIPMENT LIST UHD REVISED P&ID PROCESS D/S FOR MACHINERY ITEMS REVIEW & COMMENTS EQUIPMENT LIST UHD REVISED P&ID PROCESS D/S FOR EQUIPMENTS EQUIPMENT LIST UHD REVISED P&ID LINE LIST UPDATED D/S FOR INSTRUMENTS

ME

FABRICATION DWG.

EQ

IN

Mid & Downstream Business Training Module REVIEW STAGE:

 Review of Contract Documents

 Preparation of TQs

Mid & Downstream Business Training Module STAGE 0:


 P&IDs mark up based on General Specifications, Standards, Amendments etc.  Updation of Process Datasheets based on PFD and other documents  Preparation of UHDs  Sizing of Utility lines  Preparation of Equipment list  Preparation of Utility summary  Preparation of Catalyst and Chemical summary  Preparation of Tie-in summary  Preparation of Line-list  Preparation of Hazardous source list

Mid & Downstream Business Training Module


 P&IDs mark up based on General Specifications, Standards, Amendments etc.
Standard Details

Licensor P&ID

Mid & Downstream Business Training Module


As per the standards, the control valve assembly with block & bypass and Vent & Drain arrangement is shown in detail
Marked up P&ID

Mid & Downstream Business Training Module


 Updation of Process Datasheets based on PFD and other documents

Mid & Downstream Business Training Module


Updated Process Datasheets

Mid & Downstream Business Training Module


 Preparation of UHDs

Mid & Downstream Business Training Module


 Sizing of Utility lines

Mid & Downstream Business Training Module


 Preparation of Equipment List

Equipment list
ISOMERISATION PROJECT
MUMBAI

TITLE : EQUIPME NT LIST


EQUIPMENT NO. SERV ICE NO. REQD. DIMENSIONS (ID) .X(TL-TL) (m) INTERNAL TY PE EQUIPMENT THICKNESS (mm) ERECTION WEIGHT (Tons ) SHEL L & HEA D TRA YS MOC + C.A OPERA TING COND ITION PRESSU RE TEMP (kg/cm g)
2

DESIGN CON DITION PRESSU RE (kg/cm2g) TEMP. (C)

INSULA TION TY PE THICKNESS (mm)

(C)

TOP BOTTOM TOP BOTTOM

COLUMNS LNHT UNIT


DA- 317 01 STRIPPER 1 To p = 2.0 Bottom = 2 .8 TL -TL = 2 7.9 To p = 3.2 Bottom = 4 .0 TL -TL = 3 6.9 Tr ays , Distri butor Inte rna l b aff les, Vo rtex Bre aker, KCS + 3 mm TP 4 10 91 17 1 Int : 1 5.82 Ex t : FV 23 2 17 1 IH 12 5

DA- 317 02

DEPENTA NIZER

Tr ays , Distri butor Inte rna l b aff les, Vo rtex Bre aker,

KCS + 3 mm

TP 4 10

70

11 9

Int : 4 Ex t : FV

14 7 11 9

IH

80

PENEX UNIT
To p =1 .7 DA- 328 10 STA BILIZER 1 Bottom = 3 .2 TL -TL =26 .2 Tr ays , Distri butor Inte rna l b aff les, Vo rtex Bre aker, Int : 1 3.5 Ex t : FV 21 0 17 9

KCS+3 mm

TP 4 10

57

17 9

IH

12 0

DA- 328 11

LPG STRIPPER

0.75 x 21

Tr ays , Distri butor Inte rna l b aff les, Vo rtex Bre aker,

CS+3 mm

TP 4 10

45

60

Int : 1 3.5 Ex t : FV

12 0 60

Mid & Downstream Business Training Module


 Preparation of Equipment List (Continued) Equipment List contains the information such as Equipment Number Service Dimensions Internals Material of Construction Operating and Design Conditions Insulation Details Other Special requirements

Mid & Downstream Business Training Module

Sample view of Equipment list


ISOMERISATION PROJECT
MUMBAI

TITLE : EQUIPMENT LIST


EQUIPMENT NO. SERVICE NO. REQD. DIMENSIONS (ID).X(TL-TL) (m) INTERNAL TYPE EQUIPMENT THICKNESS (mm) ERECTION WEIGHT (Tons) SHELL & HEAD TRAYS MOC + C.A OPERATING CONDITION PRESSURE TEMP (kg/cm2g) (C) TOP BOTTOM TOP BOTTOM DESIGN CONDITION PRESSURE (kg/cm2g) TEMP. (C) INSULATION TYPE THICKNESS (mm)

COLUMNS
LNHT UNIT
Top = 2.0 DA-31701 STRIPPER 1 Bottom = 2.8 TL-TL = 27.9 Top = 3.2 DA-31702 DEPENTANIZER 1 Bottom = 4.0 TL-TL = 36.9 Trays, Distributor Internal baffles, Vortex Breaker, Int : 15.82 Ext : FV 232 171

KCS + 3 mm

TP 410

91

171

IH

125

Trays, Distributor Internal baffles, Vortex Breaker,

KCS + 3 mm

TP 410

70

119

Int : 4 Ext : FV

147 119

IH

80

PENEX UNIT
Top =1.7 DA-32810 STABILIZER 1 Bottom = 3.2 TL-TL=26.2 Trays, Distributor Internal baffles, Vortex Breaker, Trays, Distributor Internal baffles, Vortex Breaker, KCS+3mm TP 410 57 179 Int : 13.5 Ext : FV 210 179 IH 120

DA-32811

LPG STRIPPER

0.75 x 21

CS+3mm

TP 410

45

60

Int : 13.5 Ext : FV

120 60

Mid & Downstream Business Training Module


 Preparation of Utility summary
 Utility Summary summarizes the consumption / generation of utilities in all equipments.  The utility data for consumption to be furnished with - ve value. Similarly the utility data for generation to be furnished with +ve value.  Following are the Utilities taken into account Electricity Steam Condensate Boiler Feed Water Cooling Water Service Water and Portable Water Instrument Air, Plant Air and Nitrogen Fuel Gas and Fuel Oil

Mid & Downstream Business Training Module


Sample View of Utility summary

Mid & Downstream Business Training Module


 Preparation of Chemical summary
This document summarizes the consumption of Chemicals for the process.
L&T-CHIYODA
BARODA, INDIA Document No.: A-31 Rev.: 0

ISOMERISATION PROJECT TITLE : CHEMICAL SUMMARY

Chemical Identification Sr. No. % Purity Chemical Service

First fill quantity required

Scope of supply

1 2 3 4 5 6 7 8

DMDS Caustic for LNHT reactor neutralisation Soda Ash (Na2CO3) Sodium Nitrate (NaNO3) Perchloroethylene (C2Cl4) Anhydrous Hydrochloric Acid (HCl) Make-up Caustic (NaOH) for Penex unit Anhydrous Ammonia

-20% Wt 100% 100% 99.9 % Min. -20% Wt --

As a sulfiding agent during stat-up Required to neutraiize reactor effluent gases For preparing neutralizing solution during regeneration For preparing neutralizing solution during regeneration As a promotor for penex reactor catalyst Required during initial start up. Required for scrubbing of gases from stabiliser & during catalyst regeneration of naphta hydrotreating reactor. Required as corrosion inhibitor for LNHT unit

3200 kg 6.5 m3 200 kg 20 kg 30 m3 2500 kg 25 m3 350 kg

MRPL MRPL MRPL MRPL MRPL MRPL MRPL MRPL

Mid & Downstream Business Training Module


 Preparation of Catalyst summary
This document summarizes the consumption of Catalyst for the process.

TITLE : CATALYST SUMMARY

Catalyst Quantity
Sr.No. Equip. Tag No. Service Equip ID (mm) Type Bed Height (mm) Bulk Density 3 (Kg /m ) Type of Loading Bed (m3) Contingency 5% (m3)
Total quantity (m3) Total quantity (kg)

Manufacturer

DC-31701

Reactor

2500

UOP "S-12" Catalyst

3720

1065

Sock

18.3

0.915

19.215

20464.0

UOP

FA-32802

Sulfur guard bed Saturation Reactor

1800

ADS-11

2600

930

Sock

6.62

0.331

6.951

6464.4

UOP

DC-32801

2400

UOP "H-8" Catalyst

2480

520

Sock

11.2

0.56

11.76

6115.2

UOP

DC-32810

Methanator Reactor

1100

Puraspec 2443

7160

--

Sock

6.8

0.34

7.14

--

UOP

DC-32811

Penex Reactor

2900

UOP "I-8" Catalyst

9240

882

Dense

61

3.05

64.05

56492.1

UOP

DC-32812

Penex Reactor

2900

UOP "I-8" Catalyst

9240

882

Dense

61

3.05

64.05

56492.1

UOP

FA-32801A

Zinc oxide treater

1200

Puraspec 2020

3200

--

Sock

3.62

0.181

3.801

--

UOP

Mid & Downstream Business Training Module


 Preparation of Tie-in summary

Battery Limit Tie-in Summary contains the following information for all ISBL & OSBL lines  Flow rate of all process and utility streams going to B/L. Operating and Design Conditions Line Specifications Main Properties of the Streams (Optional)

  

Mid & Downstream Business Training Module


Sample view of Tie-in summary

MUMBAI TITLE : BATTERY LIMIT TIE-IN SUMMARY


Sr. No. Stream Name From To Phase L/V/M Flowrates Tons/hr
Normal

Properties kg/m3 (L) Visc. MW (V) cP

Operating Conditions Pressure Temperature kg/cm2 g deg C


min/nor/max min/nor/max

Design C Pressure kg/cm2 g

(C) INCOMING UTILITY LINES:


1 2 3 4 5 6 7 MP Steam LP Steam HP Steam Instrument Air Cooling Water Supply Fuel Gas Fuel Oil B/L B/L B/L B/L B/L B/L B/L V V V V L V L 36066.0 33180.0 2930.0 625.0 2378207.0 1212.0 2273.0 18.0 18.0 18.0 29.0 1000.0 15.5 854.0
0.02 0.02 0.01

HEADER

14/15/16 3/3.5/4 39/40/41 4.5/6.5/ - /4.5/ - /4.5/5 - /13/20

255/260/270 160/175/200 330/390/408 - /40/ - /33/ - /40/ - /170/ -

22 10 45 10.5 7 6 25

HEADER

HEADER

HEADER

0.02 0.60 0.01 11.50

HEADER

HEADER

HEADER

Mid & Downstream Business Training Module


 Preparation of Line-list
 Line List contains the data related to process conditions and the data related to mechanical design and test conditions for all the lines. Line List is the base document utilized for verification of major deliverables of Piping department. Line List contains the information such as Line Number Line Size Fluid Code and Piping class From & To Location State and Nature of the fluid Operating (Normal&Alternative) and Design Conditions Steam out requirements Insulation Details Test fluid and Test pressure

 

Mid & Downstream Business Training Module


Sample View of Line-list

MUMBAI

TITLE : LINE LIST FOR LNHT UNIT

PIPING CLASS

FLUID CODE

INSULATION TYPE

SR. NO.

INSULATION THK. (MM)

IDENTIFICATION P & ID NO. SIZE (INCH)

LOCATION

UNIT NO.

LINE NO.

STATE (A) TO (L/V/M) NATURE OF FLUID

LINE NO.

FROM

10-P-3170001-A1A1

606

10

317

0001

A1A1

FA-31701

P-3170215

HC

6-P-3170002-A4A1

606

317

0002

A4A1

GA-31701A

P-3170046

HC

10-P-3170003-A1A1

606

10

317

0003

A1A1

P-3170001

P-3170216

HC

6-P-3170004-A4A1

606

317

0004

A4A1

GA-31701B

P-3170002

HC

0.75-P-3170005-A1A1

691

0.75

317

0005

A1A1

P-3170002

SN-31701

HC

0.75-P-3170006-A1A

691

0.75

317

0006

A1A

SN-31701

FLARE

HC

0.75-P-3170007-A4A1

691

0.75

317

0007

A4A1

SN-31701

P-3170001

HC

6-P-3170008-A4A1

606

317

0008

A4A1

P-3170002

FV-002

HC

6-P-3170009-A1A1

606

317

0009

A1A1

FV-002

FA-31701

HC

Mid & Downstream Business Training Module


 Preparation of Hazardous Source List  Hazardous Source List is the base document utilized for hazardous area classification drawing deliverable of Electrical department. This document contains the information such as Inlet and Outlet streams of all equipments State and Nature of the fluid Composition Max. operating temperature Properties like Density and Molecular weight Flammability Flash point Auto-ignition temperature

Mid & Downstream Business Training Module


Sample View of Hazardous Source List

Mid & Downstream Business Training Module STAGE 1:


 Hydraulic Check of Process lines  Sizing of Vessels  Thermal rating of Heat exchangers  PSV Sizing & Flare hydraulics  Preparation of Flare Load Summary  Preparation of Equipment datasheets for new items  Scope demarcation for Vendor items  Updation of P&IDs based on Hydraulic results

Mid & Downstream Business Training Module STAGE 1 (Continued):

 Updation of Pumps and Instruments datasheets based on Hydraulics  Updation of Equipment list  Development of Control and Safeguarding Narratives

Mid & Downstream Business Training Module


 Hydraulic Check of Process lines
Loop identification in PFD

Mid & Downstream Business Training Module


 Hydraulic Check of Process lines
Collecting Inputs required for hydraulic calculations

Mid & Downstream Business Training Module


Sample View of Hydraulic Calculation Sheet

Mid & Downstream Business Training Module


 Sizing of Vessels

Sizing of vessels is carried out based on Project Design Criteria (Droplet size, Residence time)

Sometimes, Sizing is governed by separation of fine entrained droplets using mesh pad, impact separators, etc.

Mid & Downstream Business Training Module


Sample view of Vessel Sizing calculation sheet

Mid & Downstream Business Training Module


 Thermal rating of Heat exchangers  Designing / Rating of heat exchangers is carried out with the help of HTRI computer program.  This activity enables the designer to model heat exchangers, allowing the designer to gauge the performance, geometry and inherent limitations of the shell and tube heat exchanger even before its fabrication.  This results in lower risks of damage to the equipment while in service.

Mid & Downstream Business Training Module


Sample HTRI Specification Sheet

Sample HTRI Tube Layout

Mid & Downstream Business Training Module


 PSV Sizing and Flare Hydraulics  The safety of personnel and the protection of equipments due to overpressure are the basis for the design, sizing, and selection of pressure relieving systems. All systems and pressure relief devices shall be designed based on the applicable codes (API 520, 521, etc.), industry standards and practices.  For Flare header Sizing, first we have to determine the appropriate relief contingencies yielding maximum loads Flare header size has to be large enough to prevent excessive backpressure on the plant safety valves and to limit gas velocity and noise to acceptable levels.

Mid & Downstream Business Training Module


Sample view of Flare Hydraulics calculation sheet

Mid & Downstream Business Training Module


 Preparation of Flare Load Summary
This document summarizes the relief load of all PSVs for the applicable relieving cases.

Mid & Downstream Business Training Module


 Preparation of Equipment datasheets for new items
L&T-CHIYODA LIMITED, Baroda
VESSEL DATASHEET
OWNER PROJECT JOB NO. DOC. NO. SHEET Rev. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 30. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. ITEM NO. SERVICE NO. REQD. POSITION FA-32850 CLEAN MP CONDENSATE FLASH VESSEL 1 VERTICAL OPERATING CONDITIONS STEAM CONDENSATE kg/h 4605 (Note-4) kg/m3 2.63 18 kg/h 40861 (Note-4) kg/m3 915.4 kg/cm2g 4 C 151.6 min 5 DESIGN CONDITIONS IBR IS APPLICABLE NO YES mm 1400 mm 4100 mm N.A. mm N.A. kg/cm2g 10 C 225 (NOTE-1) NO YES 100 % NO YES HOT COLD 2:1 ELLIPSE TORISPHERICAL NO YES NO YES REFER UOP STD. DRG. 3-122 3 NO YES kg/cm2g A2A MATERIAL @ C : : : : : MANGALORE REFINERY AND PETROCHEMICALS LTD. LIGHT NAPHTHA ISOMERISATION BLOCK DL-4126 A-328-30006 3 OF 4 REV. MADE CHKD. APVD. DATE 0 NPK RHD RJB 12/4/2004

FLUID QUANTITY DENSITY MW QUANTITY DENSITY PRESSURE TEMPERATURE NORMAL HOLD UP TIME LIQ. GAS / VAPOR

CODE / REGULATION SPECIAL SERVICE INSIDE DIAMETER TL-TL LENGTH INSIDE DIAMETER OF BOOT TL-TL LENGTH OF BOOT DESIGN PRESSURE DESIGN TEMPERATURE VACUUM CONDITION IF YES THEN INSULATION IF YES THEN TYPE HEAD TYPE DEMISTER IF YES THEN TYPE VORTEX BREAKER IF YES THEN TYPE CORROSION ALLOWANCE STEAM OUT CONDITION IF YES THEN STEAM PRESS. / TEMP. VESSEL TRIM

153

C 120 mm

PP THICKNESS : HEMISPHERICAL OTHER

mm

Mid & Downstream Business Training Module


 Scope demarcation for Vendor items Vendor scope of supply has to be identified and to be clearly marked in the P&IDs.

Mid & Downstream Business Training Module


 Updation of P&IDs based on Hydraulic results

Licensor P&ID

Mid & Downstream Business Training Module


Updated P&ID based on Hydraulics

Compressor Suction line is increased to 6 from 4 as per hydraulic calculations

Mid & Downstream Business Training Module


 Updation of Pumps and Instruments datasheets based on Hydraulics

Licensor Datasheet

Mid & Downstream Business Training Module


Updated Pumps datasheets based on Hydraulics

Mid & Downstream Business Training Module


 Development of Control Narratives

This narrative describes the plant control systems by instrumentation. The purpose of this document are as follows : (1) To explain control systems to those who may not be familiar with instrumentation symbols or functional logic diagrams. (2) To define purpose and algorithm of each control system.

Pump auto start systems will be also covered in this document.

Mid & Downstream Business Training Module

 Development of Safeguarding Narratives

The purpose of this narrative is to thoroughly explain the safeguarding scheme and its significance. Based on the same it is possible to understand how safeguarding scheme works and how it will be depicted in Cause and Effect diagram or Safeguarding Matrix.

Mid & Downstream Business Training Module


Sample of Cause and Effect Diagram
EFFECT 51UZA-2100 V-51203 / V-51201 SGS

Effect Section
P-5105B HP STEAM VALVE P-51402A MP BFW PUMP P-51206A HP BFW PUMP P-51206B HP BFW PUMP P-51206C HP BFW PUMP P-51206D HP BFW PUMP P-5105A HP BFW PUMP P-51203 HP BFW PUMP DESCRIPTION ACTION TAG NO. 51LZA-2008 51LZA-2011 51LZA-2008 51LZA-2011 51LZA-2008 X X X X X X X X X 51LZA-2011

SAFE GUARDING MATRIX

UNIT 51

Cause Section
CAUSE

CLOSE 51UZA-2103

TRIP 51UZA-2102

TRIP 51UZA-2104

TRIP 51UZA-2100

TRIP 51UZA-2105

TRIP 51UZA-2106

TRIP 51UZA-2107

TRIP 51UZA-2108

ALARM 51UZA-2100 X X X

TAG NO.

DESCRIPTION

PEFS NO.

<51HS-2012 is 'BOTH' position> 51LZA-2008 V-51203 LEVEL LOW LOW 51LZA-2011 V-51210 LEVEL LOW LOW D-0098-51-25-0006 D-1651-51-50-0018 X X X X X X X X

<51HS-2012 is 'V-51203' position> 51LZA-2008 V-51203 LEVEL LOW LOW 51LZA-2011 V-51210 LEVEL LOW LOW D-0098-51-25-0006 D-1651-51-50-0018 X X X X X X X X

<51HS-2012 is 'V-51210' position> 51LZA-2008 V-51203 LEVEL LOW LOW 51LZA-2011 V-51210 LEVEL LOW LOW D-0098-51-25-0006 D-1651-51-50-0018

COMMON TRIP ALARM

Mid & Downstream Business Training Module STAGE 2:

 Interface Activities  Updation of Control & Safeguarding narratives and issue for HAZOP Study  Updation of Utility summary  Updation of Line list

Mid & Downstream Business Training Module


 Interface Activities

    

Vendor Document Review Review of Engineering Drawings Review of Plot Plan 3D-Model Review Review of DCS Graphics

Mid & Downstream Business Training Module


 Vendor Document Review Some of the Critical points to be reviewed in Engineering Drawings are:  Consistency of Process data as per process datasheets such as Operating & Design Conditions, MOC, Special service requirements, etc. Review of other technical aspects (a) Meeting all Specifications as per requirement. (b) Expected Utility consumption figures. (c) Guarantee figures, if any. (d) Other technical requirements specified in the requisition. (e) Fulfilment of Scope of Supply.

Mid & Downstream Business Training Module


 Review of Engineering Drawings

Some of the Critical points to be reviewed in Engineering Drawings are:  Consistency of Process data as per process datasheets such as Operating & Design Conditions, MOC, Special service requirements, etc. Number of Nozzles Sizes of Nozzles Checking location and orientation of all nozzles especially nozzles for Temperature, Pressure and Level Instruments as per Project requirements

  

Mid & Downstream Business Training Module


 Review of Plot Plan Some of the Critical points to be reviewed in Plot plan are:        Consistency of equipments shown in plot plan with Equipment List, PFD and P&IDs. Are the distances between equipment kept minimum with respect to pressure drop? Are the height of Towers and vessels enough to provide NPSH of pumps? Are the equipment located symmetrically such as column and reboilers? Is there enough space around columns, towers and reactors for removal of internals? Is there enough space to remove tube bundle of heat exchangers? Are the equipments arranged considering safety aspects especially for Fired heaters, Compressors and Tanks?

Mid & Downstream Business Training Module


 3D-Model Review Some of the Critical points to be considered in 3D-model review are:   Is piping arranged to provide straight run requirement such as inlet of tower? Are CV sets placed as per Project requirements such as closeness to equipment, at high or low level, etc., if any? Are symmetrical piping considered for AFCs? Are the valves located at operable location from the nearest platform or grade? Is piping arranged to keep special bending radius requirements, if any?

  

Mid & Downstream Business Training Module


 Review of DCS Graphics
Review of Control logics as per Control & Safeguarding narratives

Mid & Downstream Business Training Module STAGE 2 (Continued):

 Updation of Control & Safeguarding narratives and issue for HAZOP Study  Updation of Utility summary  Updation of Line list

Mid & Downstream Business Training Module STAGE 3:

 Safety Studies / Analysis  Updation of P&IDs based on Safety Studies recommendation  Preparation of Precommisioning manual  Preparation of Operating manual

Mid & Downstream Business Training Module

 Safety Studies / Analysis

 HAZOP Study  SIL Study  FIREPRAN Study

Mid & Downstream Business Training Module


HAZOP Study

HAZard and OPerability study is a technique to examine a system, part by part, in a very systematic manner, to find out the cause and consequence of every conceivable deviation in the normal operation of the system as well as during emergencies, start-ups and shutdowns. The method enables prediction of all possible ways in which a hazard or an operating problem could arise, whether the design takes preventive care of them and if not,

recommends changes (Action) as may be necessary.

Mid & Downstream Business Training Module


SIL
 Measurement of confidence level for performance of safety

function is called the Safety Integrity Level(SIL)


 Safety integrity of a system can be defined as

The probability (likelihood) of a safety-related system performing the required safety function under all the stated conditions within a stated period of time
 SIL is a measure of the reliability of the safety function

performing to specification.
 The SIL is based on the accepted risk level and ranges from 1

to 4
Safety Integrity Level (SIL) 4 3 2 1 Probability of Failure Mode of Operation On demand Mode of Operation continuous (average probability of failure to perform (probability of dangerous failure per its design function upon demand) hour) -5 -4 > 10 to < 10 > 10-9 to < 10-8 > 10-4 to < 10-3 > 10-8 to < 10-7 > 10-3 to < 10-2 > 10-7 to < 10-6 > 10-2 to < 10-1 > 10-6 to < 10-7

Mid & Downstream Business Training Module


FIREPRAN study
FIRE PRotection & ANalysis is a new technique employed at the design phase of a facility or installation to achieve the following objectives
 Overview the role of the facility and its significance to the overall operation.  Review the facilitys Fire and Explosion Strategy (FES) in the context of the role of the facility and its significance to the overall company.  Analyze threats to loss of containment or other potential sources of combustion events.  Assess release event consequences and explosion scenarios  Review and assess adequacy of threat control measures, mitigation and recovery measures.  Make recommendation for risk reduction measures to achieve levels as low as reasonably practicable (ALARP).

Mid & Downstream Business Training Module


Example for Firepran Study
Column middle cut pool fire and isopleths is analyzed as shown below in case of possible explosion due to oil leakage above its Auto Ignition Temperature.
Heat Flux kW/m2 Sufficient to cause pin to personnel if unable to reach cover within 20 seconds. No damage Effects on Human Effects on Property

12.5

This level of radiation will cause a 30% chance of fatality for a prolonged exposure.

Minimum energy required for piloted ignition of wood, melting of plastic tubing Failure of steel structures within 30 minutes

37.5

Sufficient to cause damage to process equipment. Exposure to this level of radiation is assumed to give rise to a 100% chance of fatality

Mid & Downstream Business Training Module Critical Area identification

Area in red needs to be given extensive consideration for fire protection systems

Mid & Downstream Business Training Module


STAGE 3 (Continued):

 Updation of P&IDs based on Safety Studies recommendation